Worldwide wastewater treatment observatory · Italy
Aguas SB Observatory · public data to understand water
WWTP Poggio Mirteto - Ferruti (Coste)
Italy · official identifier IT12DRU-0526
6,000h-e design capacity (2022) · 1775th of 3,726 (tied with 102 others)
European Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · official identifier IT12DRU-0526 · reported size 6,000 h-e design capacity · received load 3,671 h-e · reported treatment: S · data year 2022. 1775th of 3,726 records with reported size in the inventory of Italy (tied with 102 others); < 0.01 % of the sum of those 3,726 records in h-e (sum of records, not national capacity); nearest inventoried plant at 1.4 km · 1 within 10 km. Reported data with their source; estimates are not measurements of the plant.
Aguas SB does not manage this wastewater treatment plant.
WHAT THE DATA REPORT
Reported data official data · 2022
| Treatment | secundario (as reported to the EEA: S) · reported levels |
|---|---|
| Nitrogen removal | not reported |
| Phosphorus removal | not reported |
| UV disinfection | not reported |
| Status | active |
| Reported coordinates | 42.2622, 12.6701 precision reported by the source: level 2 what it means |
| Source and year | European Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · dataset record |
REGULATORY REFERENCES
Referencia normativa: Italy
Regulatory framework of Italy · Directive (EU) 2024/3019: reported-capacity band 1,000 to 9,999 p.e.; obligations are set by agglomeration load, not by the capacity of this plant. Individual applicability is not determined in this profile.
SCENARIO
Reference energy scenario for this load estimate · simulator engine
what this estimate is · Inputs: 3,671 p.e. of reported load; equivalent average load 2,532 p.e. with the reference profile of Italy (hypothesis with reported load and reference profile; not a measurement). Open this scenario in the simulator · how it is calculated and what it is not.
Reference scenario computed on the server from the reported load and the country profile; an estimate, not a measurement. The simulator recomputes it when opened.
WATER THAT COULD RETURN
Reuse potential
what this estimate is · Volume estimated from the reported load (734 m³/day of reference), not measured or available for reclamation.
NEARBY PLANTS
Nearby wastewater treatment plants
| Plant | Distance | Capacity (h-e) | Load 2022 | Treatment |
|---|---|---|---|---|
| Poggio Mirteto - Ferruti (S Paolo) | 1.4 km | 2,000 | 1,224 | not reported |
| Depuratore_doria | 11.4 km | 9,000 | 8,550 | primary, secondary and tertiary |
| Guance_rosse | 12.0 km | 350 | 333 | primary, secondary and tertiary |
| Prato Dell'Olmo | 12.4 km | 10,000 | 7,079 | not reported |
| Dep_com_valle_maggese | 13.7 km | 6,000 | 5,700 | primary, secondary and tertiary |
Distances are between reported coordinates; proximity does not establish a hydraulic connection.
QUESTIONS
Frequently asked questions about this plant
What capacity does WWTP Poggio Mirteto - Ferruti (Coste) report?
Reported size: 6,000 h-e design capacity. Received load: 3,671 h-e. Units are retained without conversion.
What treatment is reported?
Treatment S. Nitrogen, phosphorus and UV are shown only when explicitly reported.
How much energy would a reference plant use with the load of Poggio Mirteto - Ferruti (Coste)?
Aguas SB simulator reference scenario for 3,671 p.e. of reported load: 132,432 kWh per year (52.3 kWh per p.e. of average load), with aeration as 66 % of consumption. Estimate with the country reference profile; not a measurement of the plant.
SOURCE AND CORRECTIONS
Source
reported data · European Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · data 2022 · edition 2023 · source licence: CC BY 4.0 · JSON for this plant · suggest a correction · catalogue 2026-11-06. Reported data, not a current inspection; no compliance judgements.