Worldwide wastewater treatment observatory · Italy
Aguas SB Observatory · public data to understand water
WWTP POZZUOLI_NA_IMPIANTO_NAPOLI_OVEST_CUMA
Italy · official identifier IT15Q15000000008
1,200,000h-e design capacity (2022) · 6th of 3,726
European Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · official identifier IT15Q15000000008 · reported size 1,200,000 h-e design capacity · received load 1,108,455 h-e · reported treatment: PST · data year 2022. 6th of 3,726 records with reported size in the inventory of Italy; 1.1 % of the sum of those 3,726 records in h-e (sum of records, not national capacity); nearest inventoried plant at 13.7 km. Reported data with their source; estimates are not measurements of the plant.
Aguas SB does not manage this wastewater treatment plant.
WHAT THE DATA REPORT
Reported data official data · 2022
| Treatment | primary + secondary + tertiary (more stringent) (as reported to the EEA: PST) · reported levels |
|---|---|
| Nitrogen removal | yes |
| Phosphorus removal | not reported |
| UV disinfection | yes |
| Status | active |
| Reported coordinates | 40.8739, 14.0692 precision reported by the source: level 2 what it means |
| Source and year | European Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · dataset record |
FUENTES PÚBLICAS
What public sources report
Documented milestones
- 2019-12 · Work to upgrade the water treatment line at Cuma, also known as Naples West, was completed. Campania Environmental Protection Agency
- 2024-07-15 · The regional bulletin published a plan to restore and clear the inlet conduit to the Cuma wastewater treatment plant. Campania Region
Other published data
| Mean annual volume treated reported in the 2022 cycle | 65,700,000 m³/year (2022) · source |
|---|
Facts taken from public documents, with their date and link; an authorisation, a project or a planned capacity do not prove operation or quantities actually treated. Aguas SB editorial layer, lot L03; it does not change the official data.
REGULATORY REFERENCES
Referencia normativa: Italy
Regulatory framework of Italy · Directive (EU) 2024/3019: reported-capacity band 150,000 p.e. or more; obligations are set by agglomeration load, not by the capacity of this plant. Individual applicability is not determined in this profile.
SCENARIO
Reference energy scenario for this load estimate · simulator engine
what this estimate is · Inputs: 1,108,455 p.e. of reported load; equivalent average load 764,834 p.e. with the reference profile of Italy (hypothesis with reported load and reference profile; not a measurement). Open this scenario in the simulator · how it is calculated and what it is not.
Reference scenario computed on the server from the reported load and the country profile; an estimate, not a measurement. The simulator recomputes it when opened.
WATER THAT COULD RETURN
Reuse potential
what this estimate is · Volume estimated from the reported load (221,691 m³/day of reference), not measured or available for reclamation.
NEARBY PLANTS
Nearby wastewater treatment plants
| Plant | Distance | Capacity (h-e) | Load 2022 | Treatment |
|---|---|---|---|---|
| Procida_depuratore_loc_sancio_cattolico_marina_grande | 13.7 km | not reported | 15,981 | not reported |
| Villa_literno_ce_impianto_foce_regi_lagni | 16.4 km | 672,000 | 670,132 | primary and secondary |
| Cellole_depuratore_localita_doccia | 19.3 km | 5,029 | 4,733 | primary and secondary |
| Rotondi_impianto_di_rotondi_via_patricelli | 19.4 km | 30,000 | 33,732 | primary and secondary |
| Ischia_sistema_collettamento_ischia_barano | 19.6 km | not reported | not reported | not reported |
Distances are between reported coordinates; proximity does not establish a hydraulic connection.
QUESTIONS
Frequently asked questions about this plant
What capacity does WWTP POZZUOLI_NA_IMPIANTO_NAPOLI_OVEST_CUMA report?
Reported size: 1,200,000 h-e design capacity. Received load: 1,108,455 h-e. Units are retained without conversion.
What treatment is reported?
Treatment PST. Nitrogen, phosphorus and UV are shown only when explicitly reported.
How much energy would a reference plant use with the load of POZZUOLI_NA_IMPIANTO_NAPOLI_OVEST_CUMA?
Aguas SB simulator reference scenario for 1,108,455 p.e. of reported load: 23,742,844 kWh per year (31.0 kWh per p.e. of average load), with aeration as 60 % of consumption. Estimate with the country reference profile; not a measurement of the plant.
SOURCE AND CORRECTIONS
Source
reported data · European Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · data 2022 · edition 2023 · source licence: CC BY 4.0 · JSON for this plant · suggest a correction · catalogue 2026-11-06. Reported data, not a current inspection; no compliance judgements.