WWTP REGGIO_EMILIA_RONCOCESI

Italy · official identifier IT08000000000233

150,000h-e design capacity (2022) · 109th of 3,726 (tied with 5 others)

European Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · official identifier IT08000000000233 · reported size 150,000 h-e design capacity · received load 87,985 h-e · reported treatment: PST · data year 2022. 109th of 3,726 records with reported size in the inventory of Italy (tied with 5 others); 0.14 % of the sum of those 3,726 records in h-e (sum of records, not national capacity); nearest inventoried plant at 5.6 km · 2 within 10 km. Reported data with their source; estimates are not measurements of the plant.

Aguas SB does not manage this wastewater treatment plant.

WHAT THE DATA REPORT

Reported data official data · 2022

150,000h-e design capacity
87,985h-e received load (2022)
59 %reported load/capacity ratio (not hydraulic utilisation)
109th of 3,726by reported size among the 3,726 records with a size in the inventory (tied with 5 others) · 0.14 % of the sum of those records (sum of records, not national capacity) · the largest plants in the country · how it is calculated
Treatmentprimary + secondary + tertiary (more stringent) (as reported to the EEA: PST) · reported levels
Nitrogen removalyes
Phosphorus removalyes
UV disinfectionnot reported
Statusactive
Reported coordinates44.7327, 10.5578 precision reported by the source: level 2 what it means
Source and yearEuropean Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · dataset record

FUENTES PÚBLICAS

What public sources report

Documented milestones

Facts taken from public documents, with their date and link; an authorisation, a project or a planned capacity do not prove operation or quantities actually treated. Aguas SB editorial layer, lot L06; it does not change the official data.

REGULATORY REFERENCES

Referencia normativa: Italy

Regulatory framework of Italy · Directive (EU) 2024/3019: reported-capacity band 150,000 p.e. or more; obligations are set by agglomeration load, not by the capacity of this plant. Individual applicability is not determined in this profile.

SCENARIO

Reference energy scenario for this load estimate · simulator engine

2,606,411reference kWh per year for this load
42.9kWh per h-e (average load) per year
390,962€ per year at 0.15 €/kWh
50 %share of energy used for aeration

what this estimate is · Inputs: 87,985 p.e. of reported load; equivalent average load 60,710 p.e. with the reference profile of Italy (hypothesis with reported load and reference profile; not a measurement). Open this scenario in the simulator · how it is calculated and what it is not.

Reference scenario computed on the server from the reported load and the country profile; an estimate, not a measurement. The simulator recomputes it when opened.

WATER THAT COULD RETURN

Reuse potential

6.4estimated hm³ of treated water per year
tertiary treatment reporteda starting point for reclamation

what this estimate is · Volume estimated from the reported load (17,597 m³/day of reference), not measured or available for reclamation.

LOCATION

Italy: this plant on the map

this plant on the map · regional directory.

NEARBY PLANTS

Nearby wastewater treatment plants

PlantDistanceCapacity (h-e)Load 2022Treatment
Cadelbosco5.6 km8,0006,328primary, secondary and tertiary
Reggio_emilia_mancasale7.6 km280,000170,815primary, secondary and tertiary
Quattro_castella_le_forche11.1 km20,00012,996primary, secondary and tertiary
Gattatico_praticello11.3 km7,0005,703primary, secondary and tertiary
Cadelbosco_villa_seta_nuovo11.3 km5,0003,323primary, secondary and tertiary

Distances are between reported coordinates; proximity does not establish a hydraulic connection.

QUESTIONS

Frequently asked questions about this plant

What capacity does WWTP REGGIO_EMILIA_RONCOCESI report?

Reported size: 150,000 h-e design capacity. Received load: 87,985 h-e. Units are retained without conversion.

What treatment is reported?

Treatment PST. Nitrogen, phosphorus and UV are shown only when explicitly reported.

How much energy would a reference plant use with the load of REGGIO_EMILIA_RONCOCESI?

Aguas SB simulator reference scenario for 87,985 p.e. of reported load: 2,606,411 kWh per year (42.9 kWh per p.e. of average load), with aeration as 50 % of consumption. Estimate with the country reference profile; not a measurement of the plant.

SOURCE AND CORRECTIONS

Source

reported data · European Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · data 2022 · edition 2023 · source licence: CC BY 4.0 · JSON for this plant · suggest a correction · catalogue 2026-11-06. Reported data, not a current inspection; no compliance judgements.