Worldwide wastewater treatment observatory · Italy
Aguas SB Observatory · public data to understand water
WWTP RETE CORCHIANO
Italy · official identifier IT12Q23ATO1056
not reportedh-e design capacity (2022)
European Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · official identifier IT12Q23ATO1056 · reported size not reported h-e design capacity · received load 3,246 h-e · data year 2022. nearest inventoried plant at 5.0 km · 5 within 10 km. Reported data with their source; estimates are not measurements of the plant.
Aguas SB does not manage this wastewater treatment plant.
WHAT THE DATA REPORT
Reported data official data · 2022
| Treatment | not reported |
|---|---|
| Nitrogen removal | not reported |
| Phosphorus removal | not reported |
| UV disinfection | not reported |
| Status | active |
| Reported coordinates | 42.3454, 12.3560 precision reported by the source: level 2 what it means |
| Source and year | European Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · dataset record |
REGULATORY REFERENCES
Referencia normativa: Italy
Regulatory framework of Italy. Individual applicability is not determined in this profile.
SCENARIO
Reference energy scenario for this load estimate · simulator engine
what this estimate is · Inputs: 3,246 p.e. of reported load; equivalent average load 2,239 p.e. with the reference profile of Italy (hypothesis with reported load and reference profile; not a measurement). Open this scenario in the simulator · how it is calculated and what it is not.
Reference scenario computed on the server from the reported load and the country profile; an estimate, not a measurement. The simulator recomputes it when opened.
WATER THAT COULD RETURN
Reuse potential
what this estimate is · Volume estimated from the reported load (649 m³/day of reference), not measured or available for reclamation.
NEARBY PLANTS
Nearby wastewater treatment plants
| Plant | Distance | Capacity (h-e) | Load 2022 | Treatment |
|---|---|---|---|---|
| Rete Fabrica Di Roma | 5.0 km | not reported | 5,729 | not reported |
| Brecciara | 8.4 km | 30,000 | 12,200 | primary, secondary and tertiary |
| Depuratore Vasanello | 8.5 km | 3,000 | 4,301 | primary and secondary |
| Reti Canepina-Vallerano-Vignanello | 9.5 km | not reported | 10,688 | not reported |
| Rete Caprarola | 9.6 km | not reported | 5,959 | not reported |
Distances are between reported coordinates; proximity does not establish a hydraulic connection.
QUESTIONS
Frequently asked questions about this plant
What capacity does WWTP RETE CORCHIANO report?
Reported size: not reported h-e design capacity. Received load: 3,246 h-e. Units are retained without conversion.
What treatment is reported?
Treatment not reported. Nitrogen, phosphorus and UV are shown only when explicitly reported.
How much energy would a reference plant use with the load of RETE CORCHIANO?
Aguas SB simulator reference scenario for 3,246 p.e. of reported load: 118,338 kWh per year (52.9 kWh per p.e. of average load), with aeration as 65 % of consumption. Estimate with the country reference profile; not a measurement of the plant.
SOURCE AND CORRECTIONS
Source
reported data · European Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · data 2022 · edition 2023 · source licence: CC BY 4.0 · JSON for this plant · suggest a correction · catalogue 2026-11-06. Reported data, not a current inspection; no compliance judgements.