Worldwide wastewater treatment observatory · Italy
Aguas SB Observatory · public data to understand water
WWTP RSFG0150271101_RS2_Pero
Italy · official identifier IT03Q230000010
not reportedh-e design capacity (2022)
European Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · official identifier IT03Q230000010 · reported size not reported h-e design capacity · received load 211 h-e · data year 2022. nearest inventoried plant at 2.8 km · 7 within 10 km. Reported data with their source; estimates are not measurements of the plant.
Aguas SB does not manage this wastewater treatment plant.
WHAT THE DATA REPORT
Reported data official data · 2022
| Treatment | not reported |
|---|---|
| Nitrogen removal | not reported |
| Phosphorus removal | not reported |
| UV disinfection | not reported |
| Status | active |
| Reported coordinates | 45.5643, 9.0652 precision reported by the source: level 2 what it means |
| Source and year | European Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · dataset record |
REGULATORY REFERENCES
Referencia normativa: Italy
Regulatory framework of Italy. Individual applicability is not determined in this profile.
SCENARIO
Reference energy scenario for this load estimate · simulator engine
what this estimate is · Inputs: 211 p.e. of reported load; equivalent average load 145 p.e. with the reference profile of Italy (hypothesis with reported load and reference profile; not a measurement). Open this scenario in the simulator · how it is calculated and what it is not.
Reference scenario computed on the server from the reported load and the country profile; an estimate, not a measurement. The simulator recomputes it when opened.
WATER THAT COULD RETURN
Reuse potential
what this estimate is · Volume estimated from the reported load (42 m³/day of reference), not measured or available for reclamation.
NEARBY PLANTS
Nearby wastewater treatment plants
| Plant | Distance | Capacity (h-e) | Load 2022 | Treatment |
|---|---|---|---|---|
| Dp01203401_caronno_pertusella | 2.8 km | 220,000 | 113,411 | primary, secondary and tertiary |
| Dp01511601_origgio_est_lainate | 3.8 km | 31,660 | 7,912 | primary, secondary and tertiary |
| Dp01210901_origgio | 5.2 km | 75,000 | 51,602 | primary, secondary and tertiary |
| Dp01517001_pero_olona_sud | 7.5 km | 620,600 | 587,052 | primary, secondary and tertiary |
| Dp01515401_parabiago_cerro_maggiore | 7.9 km | 32,600 | 28,023 | primary, secondary and tertiary |
Distances are between reported coordinates; proximity does not establish a hydraulic connection.
QUESTIONS
Frequently asked questions about this plant
What capacity does WWTP RSFG0150271101_RS2_Pero report?
Reported size: not reported h-e design capacity. Received load: 211 h-e. Units are retained without conversion.
What treatment is reported?
Treatment not reported. Nitrogen, phosphorus and UV are shown only when explicitly reported.
How much energy would a reference plant use with the load of RSFG0150271101_RS2_Pero?
Aguas SB simulator reference scenario for 211 p.e. of reported load: 15,945 kWh per year (110.0 kWh per p.e. of average load), with aeration as 41 % of consumption. Estimate with the country reference profile; not a measurement of the plant.
SOURCE AND CORRECTIONS
Source
reported data · European Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · data 2022 · edition 2023 · source licence: CC BY 4.0 · JSON for this plant · suggest a correction · catalogue 2026-11-06. Reported data, not a current inspection; no compliance judgements.