Worldwide wastewater treatment observatory · Italy

Aguas SB Observatory · public data to understand water

WWTP RSFG0170220101_Borno_2

Italy · official identifier IT03Q11000000095

not reportedh-e design capacity (2022)

European Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · official identifier IT03Q11000000095 · reported size not reported h-e design capacity · received load 76 h-e · data year 2022. nearest inventoried plant at 0.4 km · 4 within 10 km. Reported data with their source; estimates are not measurements of the plant.

Aguas SB does not manage this wastewater treatment plant.

WHAT THE DATA REPORT

Reported data official data · 2022

not reportedh-e design capacity
76h-e received load (2022)
not reportedsin tamaño declarado · the largest plants in the country
Treatmentnot reported
Nitrogen removalnot reported
Phosphorus removalnot reported
UV disinfectionnot reported
Statusactive
Reported coordinates45.9468, 10.2005 precision reported by the source: level 2 what it means
Source and yearEuropean Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · dataset record

REGULATORY REFERENCES

Referencia normativa: Italy

Regulatory framework of Italy. Individual applicability is not determined in this profile.

SCENARIO

Reference energy scenario for this load estimate · simulator engine

6,898reference kWh per year for this load
133.3kWh per h-e (average load) per year
1,035€ per year at 0.15 €/kWh
33 %share of energy used for aeration

what this estimate is · Inputs: 76 p.e. of reported load; equivalent average load 52 p.e. with the reference profile of Italy (hypothesis with reported load and reference profile; not a measurement). Open this scenario in the simulator · how it is calculated and what it is not.

Reference scenario computed on the server from the reported load and the country profile; an estimate, not a measurement. The simulator recomputes it when opened.

WATER THAT COULD RETURN

Reuse potential

0estimated hm³ of treated water per year
tertiary treatment not reportedreclamation requires additional treatment

what this estimate is · Volume estimated from the reported load (15 m³/day of reference), not measured or available for reclamation.

LOCATION

Italy: this plant on the map

this plant on the map · regional directory.

NEARBY PLANTS

Nearby wastewater treatment plants

PlantDistanceCapacity (h-e)Load 2022Treatment
Dp01702202_borno_piandasso0.4 km1,050342primary and secondary
Dp01702203_borno_bernina0.8 km1,2502,928primary and secondary
Dp01707001_esine3.8 km40,00036,909primary, secondary and tertiary
Dp01607805_colere7.8 km9,8007,882primary, secondary and tertiary
Dp01704901_cerveno12.1 km1,200739primary and secondary

Distances are between reported coordinates; proximity does not establish a hydraulic connection.

QUESTIONS

Frequently asked questions about this plant

What capacity does WWTP RSFG0170220101_Borno_2 report?

Reported size: not reported h-e design capacity. Received load: 76 h-e. Units are retained without conversion.

What treatment is reported?

Treatment not reported. Nitrogen, phosphorus and UV are shown only when explicitly reported.

How much energy would a reference plant use with the load of RSFG0170220101_Borno_2?

Aguas SB simulator reference scenario for 76 p.e. of reported load: 6,898 kWh per year (133.3 kWh per p.e. of average load), with aeration as 33 % of consumption. Estimate with the country reference profile; not a measurement of the plant.

SOURCE AND CORRECTIONS

Source

reported data · European Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · data 2022 · edition 2023 · source licence: CC BY 4.0 · JSON for this plant · suggest a correction · catalogue 2026-11-06. Reported data, not a current inspection; no compliance judgements.