Worldwide wastewater treatment observatory · Italy
Aguas SB Observatory · public data to understand water
WWTP SAN GIORGIO
Italy · official identifier IT12Q23ATO1019
5,000h-e design capacity (2022) · 1932nd of 3,726 (tied with 154 others)
European Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · official identifier IT12Q23ATO1019 · reported size 5,000 h-e design capacity · received load 7,500 h-e · reported treatment: PS · data year 2022. 1932nd of 3,726 records with reported size in the inventory of Italy (tied with 154 others); < 0.01 % of the sum of those 3,726 records in h-e (sum of records, not national capacity); nearest inventoried plant at 1.8 km · 3 within 10 km. Reported data with their source; estimates are not measurements of the plant.
Aguas SB does not manage this wastewater treatment plant.
WHAT THE DATA REPORT
Reported data official data · 2022
| Treatment | primary + secondary (as reported to the EEA: PS) · reported levels |
|---|---|
| Nitrogen removal | yes |
| Phosphorus removal | not reported |
| UV disinfection | not reported |
| Status | active |
| Reported coordinates | 42.2441, 12.3517 precision reported by the source: level 2 what it means |
| Source and year | European Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · dataset record |
REGULATORY REFERENCES
Referencia normativa: Italy
Regulatory framework of Italy · Directive (EU) 2024/3019: reported-capacity band 1,000 to 9,999 p.e.; obligations are set by agglomeration load, not by the capacity of this plant. Individual applicability is not determined in this profile.
SCENARIO
Reference energy scenario for this load estimate · simulator engine
what this estimate is · Inputs: 7,500 p.e. of reported load; equivalent average load 5,175 p.e. with the reference profile of Italy (hypothesis with reported load and reference profile; not a measurement). Open this scenario in the simulator · how it is calculated and what it is not.
Reference scenario computed on the server from the reported load and the country profile; an estimate, not a measurement. The simulator recomputes it when opened.
WATER THAT COULD RETURN
Reuse potential
what this estimate is · Volume estimated from the reported load (1,500 m³/day of reference), not measured or available for reclamation.
NEARBY PLANTS
Nearby wastewater treatment plants
| Plant | Distance | Capacity (h-e) | Load 2022 | Treatment |
|---|---|---|---|---|
| Rete Castel Sant' Elia | 1.8 km | not reported | 2,256 | not reported |
| Depuratore_prato_della_fontana | 5.8 km | 2,500 | 4,360 | primary and secondary |
| Brecciara | 8.4 km | 30,000 | 12,200 | primary, secondary and tertiary |
| Depuratore_sutri | 10.1 km | 5,000 | 5,000 | primary, secondary and tertiary |
| Rete Fabrica Di Roma | 11.1 km | not reported | 5,729 | not reported |
Distances are between reported coordinates; proximity does not establish a hydraulic connection.
QUESTIONS
Frequently asked questions about this plant
What capacity does WWTP SAN GIORGIO report?
Reported size: 5,000 h-e design capacity. Received load: 7,500 h-e. Units are retained without conversion.
What treatment is reported?
Treatment PS. Nitrogen, phosphorus and UV are shown only when explicitly reported.
How much energy would a reference plant use with the load of SAN GIORGIO?
Aguas SB simulator reference scenario for 7,500 p.e. of reported load: 277,203 kWh per year (53.6 kWh per p.e. of average load), with aeration as 41 % of consumption. Estimate with the country reference profile; not a measurement of the plant.
SOURCE AND CORRECTIONS
Source
reported data · European Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · data 2022 · edition 2023 · source licence: CC BY 4.0 · JSON for this plant · suggest a correction · catalogue 2026-11-06. Reported data, not a current inspection; no compliance judgements.