Worldwide wastewater treatment observatory · Italy

Aguas SB Observatory · public data to understand water

WWTP SAN_VITO_AL_TAGLIAMENTO_VIA_ZUCCHERIFICIO

Italy · official identifier IT06000000000004

28,000h-e design capacity (2022) · 685th of 3,726 (tied with 6 others)

European Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · official identifier IT06000000000004 · reported size 28,000 h-e design capacity · received load 28,350 h-e · reported treatment: PST · data year 2022. 685th of 3,726 records with reported size in the inventory of Italy (tied with 6 others); 0.03 % of the sum of those 3,726 records in h-e (sum of records, not national capacity); nearest inventoried plant at 8.8 km · 3 within 10 km. Reported data with their source; estimates are not measurements of the plant.

Aguas SB does not manage this wastewater treatment plant.

WHAT THE DATA REPORT

Reported data official data · 2022

28,000h-e design capacity
28,350h-e received load (2022)
101 %reported load/capacity ratio (not hydraulic utilisation)
685th of 3,726by reported size among the 3,726 records with a size in the inventory (tied with 6 others) · 0.03 % of the sum of those records (sum of records, not national capacity) · the largest plants in the country · how it is calculated
Treatmentprimary + secondary + tertiary (more stringent) (as reported to the EEA: PST) · reported levels
Nitrogen removalyes
Phosphorus removalyes
UV disinfectionnot reported
Statusactive
Reported coordinates45.9059, 12.8503 precision reported by the source: level 2 what it means
Source and yearEuropean Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · dataset record

REGULATORY REFERENCES

Regulatory reference: Italy

Regulatory framework of Italy · Directive (EU) 2024/3019: reported-capacity band 10,000 to 149,999 p.e.; obligations are set by agglomeration load, not by the capacity of this plant. Individual applicability is not determined in this profile.

SCENARIO

Reference energy scenario for this load estimate · simulator engine

989,818reference kWh per year for this load
50.6kWh per h-e (average load) per year
148,473€ per year at 0.15 €/kWh
43 %share of energy used for aeration

what this estimate is · Inputs: 28,350 p.e. of reported load; equivalent average load 19,562 p.e. with the reference profile of Italy (hypothesis with reported load and reference profile; not a measurement). Open this scenario in the simulator · how it is calculated and what it is not.

Reference scenario computed on the server from the reported load and the country profile; an estimate, not a measurement. The simulator recomputes it when opened.

WATER THAT COULD RETURN

Reuse potential

2.1estimated hm³ of treated water per year
tertiary treatment reporteda starting point for reclamation

what this estimate is · Volume estimated from the reported load (5,670 m³/day of reference), not measured or available for reclamation.

LOCATION

Italy: this plant on the map

this plant on the map · regional directory.

NEARBY PLANTS

Nearby wastewater treatment plants

PlantDistanceCapacity (h-e)Load 2022Treatment
Cordovado_via_suzzolins8.8 km3,8003,524primary, secondary and tertiary
Teglio_veneto_loc_cintello9.8 km300300primary and secondary
Fiume_veneto_via_policreta9.9 km500500primary and secondary
Fiume_veneto_via_tavella10.5 km8,7006,147primary, secondary and tertiary
Teglio_veneto_capoluogo10.6 km800804primary and secondary

Distances are between reported coordinates; proximity does not establish a hydraulic connection.

QUESTIONS

Frequently asked questions about this plant

What capacity does WWTP SAN_VITO_AL_TAGLIAMENTO_VIA_ZUCCHERIFICIO report?

Reported size: 28,000 h-e design capacity. Received load: 28,350 h-e. Units are retained without conversion.

What treatment is reported?

Treatment PST. Nitrogen, phosphorus and UV are shown only when explicitly reported.

How much energy would a reference plant use with the load of SAN_VITO_AL_TAGLIAMENTO_VIA_ZUCCHERIFICIO?

Aguas SB simulator reference scenario for 28,350 p.e. of reported load: 989,818 kWh per year (50.6 kWh per p.e. of average load), with aeration as 43 % of consumption. Estimate with the country reference profile; not a measurement of the plant.

SOURCE AND CORRECTIONS

Source

reported data · European Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · data 2022 · edition 2023 · source licence: CC BY 4.0 · JSON for this plant · suggest a correction · catalogue 2026-11-06. Reported data, not a current inspection; no compliance judgements.