Worldwide wastewater treatment observatory · Italy
Aguas SB Observatory · public data to understand water
WWTP SANT_ANGELO · IT12000000000090
Italy · official identifier IT12000000000090
20,000h-e design capacity (2022) · 840th of 3,726 (tied with 62 others)
European Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · official identifier IT12000000000090 · reported size 20,000 h-e design capacity · received load 4,468 h-e · reported treatment: PS · data year 2022. 840th of 3,726 records with reported size in the inventory of Italy (tied with 62 others); 0.02 % of the sum of those 3,726 records in h-e (sum of records, not national capacity); nearest inventoried plant at 4.8 km · 10 within 10 km. Reported data with their source; estimates are not measurements of the plant.
Aguas SB does not manage this wastewater treatment plant.
WHAT THE DATA REPORT
Reported data official data · 2022
| Treatment | primary + secondary (as reported to the EEA: PS) · reported levels |
|---|---|
| Nitrogen removal | yes |
| Phosphorus removal | not reported |
| UV disinfection | not reported |
| Status | active |
| Reported coordinates | 41.9257, 13.0808 precision reported by the source: level 2 what it means |
| Source and year | European Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · dataset record |
REGULATORY REFERENCES
Referencia normativa: Italy
Regulatory framework of Italy · Directive (EU) 2024/3019: reported-capacity band 10,000 to 149,999 p.e.; obligations are set by agglomeration load, not by the capacity of this plant. Individual applicability is not determined in this profile.
SCENARIO
Reference energy scenario for this load estimate · simulator engine
what this estimate is · Inputs: 4,468 p.e. of reported load; equivalent average load 3,084 p.e. with the reference profile of Italy (hypothesis with reported load and reference profile; not a measurement). Open this scenario in the simulator · how it is calculated and what it is not.
Reference scenario computed on the server from the reported load and the country profile; an estimate, not a measurement. The simulator recomputes it when opened.
WATER THAT COULD RETURN
Reuse potential
what this estimate is · Volume estimated from the reported load (894 m³/day of reference), not measured or available for reclamation.
NEARBY PLANTS
Nearby wastewater treatment plants
| Plant | Distance | Capacity (h-e) | Load 2022 | Treatment |
|---|---|---|---|---|
| Dep_com_acqua_calda | 7.0 km | 3,500 | 3,325 | primary, secondary and tertiary |
| Dep_com_montebelloni_olevano_nord | 8.1 km | 1,500 | 1,425 | primary, secondary and tertiary |
| Marchigiana_romindola | 8.3 km | 10,000 | 9,500 | primary, secondary and tertiary |
| Contrada_s_quirico | 9.3 km | 300 | 285 | primary, secondary and tertiary |
| Dep_com_sorvigliano | 9.5 km | 6,500 | 6,175 | primary, secondary and tertiary |
Distances are between reported coordinates; proximity does not establish a hydraulic connection.
QUESTIONS
Frequently asked questions about this plant
What capacity does WWTP SANT_ANGELO · IT12000000000090 report?
Reported size: 20,000 h-e design capacity. Received load: 4,468 h-e. Units are retained without conversion.
What treatment is reported?
Treatment PS. Nitrogen, phosphorus and UV are shown only when explicitly reported.
How much energy would a reference plant use with the load of SANT_ANGELO · IT12000000000090?
Aguas SB simulator reference scenario for 4,468 p.e. of reported load: 158,691 kWh per year (51.5 kWh per p.e. of average load), with aeration as 67 % of consumption. Estimate with the country reference profile; not a measurement of the plant.
SOURCE AND CORRECTIONS
Source
reported data · European Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · data 2022 · edition 2023 · source licence: CC BY 4.0 · JSON for this plant · suggest a correction · catalogue 2026-11-06. Reported data, not a current inspection; no compliance judgements.