Worldwide wastewater treatment observatory · Italy
Aguas SB Observatory · public data to understand water
WWTP SANTA_CROCE_MTG_DEP
Italy · official identifier IT11Q210000004
1,200h-e design capacity (2022) · 3153rd of 3,726 (tied with 31 others)
European Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · official identifier IT11Q210000004 · reported size 1,200 h-e design capacity · received load 397 h-e · reported treatment: PS · data year 2022. 3153rd of 3,726 records with reported size in the inventory of Italy (tied with 31 others); < 0.01 % of the sum of those 3,726 records in h-e (sum of records, not national capacity); nearest inventoried plant at 1.2 km · 18 within 10 km. Reported data with their source; estimates are not measurements of the plant.
Aguas SB does not manage this wastewater treatment plant.
WHAT THE DATA REPORT
Reported data official data · 2022
| Treatment | primary + secondary (as reported to the EEA: PS) · reported levels |
|---|---|
| Nitrogen removal | not reported |
| Phosphorus removal | not reported |
| UV disinfection | not reported |
| Status | active |
| Reported coordinates | 43.1054, 13.5638 precision reported by the source: level 2 what it means |
| Source and year | European Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · dataset record |
REGULATORY REFERENCES
Referencia normativa: Italy
Regulatory framework of Italy · Directive (EU) 2024/3019: reported-capacity band 1,000 to 9,999 p.e.; obligations are set by agglomeration load, not by the capacity of this plant. Individual applicability is not determined in this profile.
SCENARIO
Reference energy scenario for this load estimate · simulator engine
what this estimate is · Inputs: 397 p.e. of reported load; equivalent average load 273 p.e. with the reference profile of Italy (hypothesis with reported load and reference profile; not a measurement). Open this scenario in the simulator · how it is calculated and what it is not.
Reference scenario computed on the server from the reported load and the country profile; an estimate, not a measurement. The simulator recomputes it when opened.
WATER THAT COULD RETURN
Reuse potential
what this estimate is · Volume estimated from the reported load (79 m³/day of reference), not measured or available for reclamation.
NEARBY PLANTS
Nearby wastewater treatment plants
| Plant | Distance | Capacity (h-e) | Load 2022 | Treatment |
|---|---|---|---|---|
| Rio_berto_mtg_dep | 1.2 km | 4,000 | 3,139 | primary and secondary |
| Cappuccini_mtg_dep | 3.4 km | 1,000 | 990 | primary and secondary |
| Molino_vecchio_flr_dep | 4.1 km | 4,000 | 2,404 | primary, secondary and tertiary |
| Soccorso_mtg_dep | 4.3 km | 1,000 | 497 | primary and secondary |
| Massa_fermana_fonte_corata_dep | 7.7 km | 200 | 75 | primary |
Distances are between reported coordinates; proximity does not establish a hydraulic connection.
QUESTIONS
Frequently asked questions about this plant
What capacity does WWTP SANTA_CROCE_MTG_DEP report?
Reported size: 1,200 h-e design capacity. Received load: 397 h-e. Units are retained without conversion.
What treatment is reported?
Treatment PS. Nitrogen, phosphorus and UV are shown only when explicitly reported.
How much energy would a reference plant use with the load of SANTA_CROCE_MTG_DEP?
Aguas SB simulator reference scenario for 397 p.e. of reported load: 21,707 kWh per year (79.6 kWh per p.e. of average load), with aeration as 51 % of consumption. Estimate with the country reference profile; not a measurement of the plant.
SOURCE AND CORRECTIONS
Source
reported data · European Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · data 2022 · edition 2023 · source licence: CC BY 4.0 · JSON for this plant · suggest a correction · catalogue 2026-11-06. Reported data, not a current inspection; no compliance judgements.