Italy · official identifier IT160000000118

226,667h-e design capacity (2022) · 68th of 3,726

European Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · official identifier IT160000000118 · reported size 226,667 h-e design capacity · received load 204,676 h-e · reported treatment: PS · data year 2022. 68th of 3,726 records with reported size in the inventory of Italy; 0.22 % of the sum of those 3,726 records in h-e (sum of records, not national capacity); nearest inventoried plant at 8.5 km · 2 within 10 km. Reported data with their source; estimates are not measurements of the plant.

Aguas SB does not manage this wastewater treatment plant.

WHAT THE DATA REPORT

Reported data official data · 2022

226,667h-e design capacity
204,676h-e received load (2022)
90 %reported load/capacity ratio (not hydraulic utilisation)
68th of 3,726by reported size among the 3,726 records with a size in the inventory · 0.22 % of the sum of those records (sum of records, not national capacity) · the largest plants in the country · how it is calculated
Treatmentprimary + secondary (as reported to the EEA: PS) · reported levels
Nitrogen removalnot reported
Phosphorus removalnot reported
UV disinfectionnot reported
Statusactive
Reported coordinates40.4288, 17.2553 precision reported by the source: level 2 what it means
Source and yearEuropean Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · dataset record

FUENTES PÚBLICAS

What public sources report

Documented milestones

  • 2025-05-12 · In 2025 the region included the expansion of the Gennarini treatment plant in Taranto in its programme of works. Apulia Region

Other published data

Mean annual volume treated reported in the 2022 cycle11,734,020 m³/year (2022) · source

Facts taken from public documents, with their date and link; an authorisation, a project or a planned capacity do not prove operation or quantities actually treated. Aguas SB editorial layer, lot L04; it does not change the official data.

REGULATORY REFERENCES

Referencia normativa: Italy

Regulatory framework of Italy · Directive (EU) 2024/3019: reported-capacity band 150,000 p.e. or more; obligations are set by agglomeration load, not by the capacity of this plant. Individual applicability is not determined in this profile.

SCENARIO

Reference energy scenario for this load estimate · simulator engine

5,088,720reference kWh per year for this load
36.0kWh per h-e (average load) per year
763,308€ per year at 0.15 €/kWh
52 %share of energy used for aeration

what this estimate is · Inputs: 204,676 p.e. of reported load; equivalent average load 141,226 p.e. with the reference profile of Italy (hypothesis with reported load and reference profile; not a measurement). Open this scenario in the simulator · how it is calculated and what it is not.

Reference scenario computed on the server from the reported load and the country profile; an estimate, not a measurement. The simulator recomputes it when opened.

WATER THAT COULD RETURN

Reuse potential

14.9estimated hm³ of treated water per year
tertiary treatment not reportedreclamation requires additional treatment

what this estimate is · Volume estimated from the reported load (40,935 m³/day of reference), not measured or available for reclamation.

LOCATION

Italy: this plant on the map

this plant on the map · regional directory.

NEARBY PLANTS

Nearby wastewater treatment plants

PlantDistanceCapacity (h-e)Load 2022Treatment
Pulsano_nuovo8.5 km34,83313,183primary, secondary and tertiary
Taranto_bellavista9.8 km116,72357,819primary and secondary
Faggiano10.4 km4,6283,361primary, secondary and tertiary
San_giorgio_jonico12.0 km32,16433,084primary, secondary and tertiary
Monteiasi13.5 km49,56639,102primary, secondary and tertiary

Distances are between reported coordinates; proximity does not establish a hydraulic connection.

QUESTIONS

Frequently asked questions about this plant

What capacity does WWTP TARANTO_GENNARINI report?

Reported size: 226,667 h-e design capacity. Received load: 204,676 h-e. Units are retained without conversion.

What treatment is reported?

Treatment PS. Nitrogen, phosphorus and UV are shown only when explicitly reported.

How much energy would a reference plant use with the load of TARANTO_GENNARINI?

Aguas SB simulator reference scenario for 204,676 p.e. of reported load: 5,088,720 kWh per year (36.0 kWh per p.e. of average load), with aeration as 52 % of consumption. Estimate with the country reference profile; not a measurement of the plant.