Worldwide wastewater treatment observatory · Italy

Aguas SB Observatory · public data to understand water

WWTP TERMOLI_PANTANO_BASSO

Italy · official identifier IT14Q90000002477

23,000h-e design capacity (2022) · 785th of 3,726 (tied with 6 others)

European Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · official identifier IT14Q90000002477 · reported size 23,000 h-e design capacity · received load 16,494 h-e · reported treatment: PST · data year 2022. 785th of 3,726 records with reported size in the inventory of Italy (tied with 6 others); 0.02 % of the sum of those 3,726 records in h-e (sum of records, not national capacity); nearest inventoried plant at 2.8 km · 5 within 10 km. Reported data with their source; estimates are not measurements of the plant.

Aguas SB does not manage this wastewater treatment plant.

WHAT THE DATA REPORT

Reported data official data · 2022

23,000h-e design capacity
16,494h-e received load (2022)
72 %reported load/capacity ratio (not hydraulic utilisation)
785th of 3,726by reported size among the 3,726 records with a size in the inventory (tied with 6 others) · 0.02 % of the sum of those records (sum of records, not national capacity) · the largest plants in the country · how it is calculated
Treatmentprimary + secondary + tertiary (more stringent) (as reported to the EEA: PST) · reported levels
Nitrogen removalyes
Phosphorus removalyes
UV disinfectionnot reported
Statusactive
Reported coordinates41.9619, 15.0054 precision reported by the source: level 2 what it means
Source and yearEuropean Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · dataset record

REGULATORY REFERENCES

Referencia normativa: Italy

Regulatory framework of Italy · Directive (EU) 2024/3019: reported-capacity band 10,000 to 149,999 p.e.; obligations are set by agglomeration load, not by the capacity of this plant. Individual applicability is not determined in this profile.

SCENARIO

Reference energy scenario for this load estimate · simulator engine

583,395reference kWh per year for this load
51.3kWh per h-e (average load) per year
87,509€ per year at 0.15 €/kWh
43 %share of energy used for aeration

what this estimate is · Inputs: 16,494 p.e. of reported load; equivalent average load 11,382 p.e. with the reference profile of Italy (hypothesis with reported load and reference profile; not a measurement). Open this scenario in the simulator · how it is calculated and what it is not.

Reference scenario computed on the server from the reported load and the country profile; an estimate, not a measurement. The simulator recomputes it when opened.

WATER THAT COULD RETURN

Reuse potential

1.2estimated hm³ of treated water per year
tertiary treatment reporteda starting point for reclamation

what this estimate is · Volume estimated from the reported load (3,299 m³/day of reference), not measured or available for reclamation.

LOCATION

Italy: this plant on the map

this plant on the map · regional directory.

NEARBY PLANTS

Nearby wastewater treatment plants

PlantDistanceCapacity (h-e)Load 2022Treatment
Campomarino_contrada_marinelle2.8 km35,00034,028primary, secondary and tertiary
Portocannone_buccaro4.0 km3,0002,860primary, secondary and tertiary
Termoli_porto_78a4.9 km35,00034,236primary, secondary and tertiary
Guglionesi_fonte_nuova8.1 km9,0008,312primary, secondary and tertiary
San_martino_in_p_laudadio9.8 km5,3005,227primary, secondary and tertiary

Distances are between reported coordinates; proximity does not establish a hydraulic connection.

QUESTIONS

Frequently asked questions about this plant

What capacity does WWTP TERMOLI_PANTANO_BASSO report?

Reported size: 23,000 h-e design capacity. Received load: 16,494 h-e. Units are retained without conversion.

What treatment is reported?

Treatment PST. Nitrogen, phosphorus and UV are shown only when explicitly reported.

How much energy would a reference plant use with the load of TERMOLI_PANTANO_BASSO?

Aguas SB simulator reference scenario for 16,494 p.e. of reported load: 583,395 kWh per year (51.3 kWh per p.e. of average load), with aeration as 43 % of consumption. Estimate with the country reference profile; not a measurement of the plant.

SOURCE AND CORRECTIONS

Source

reported data · European Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · data 2022 · edition 2023 · source licence: CC BY 4.0 · JSON for this plant · suggest a correction · catalogue 2026-11-06. Reported data, not a current inspection; no compliance judgements.