Worldwide wastewater treatment observatory · Italy

Aguas SB Observatory · public data to understand water

WWTP TORRE_SANTA_SUSANNA

Italy · official identifier IT160000000139

28,749h-e design capacity (2022) · 684th of 3,726

European Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · official identifier IT160000000139 · reported size 28,749 h-e design capacity · received load 11,973 h-e · reported treatment: PST · data year 2022. 684th of 3,726 records with reported size in the inventory of Italy; 0.03 % of the sum of those 3,726 records in h-e (sum of records, not national capacity); nearest inventoried plant at 9.1 km · 2 within 10 km. Reported data with their source; estimates are not measurements of the plant.

Aguas SB does not manage this wastewater treatment plant.

WHAT THE DATA REPORT

Reported data official data · 2022

28,749h-e design capacity
11,973h-e received load (2022)
42 %reported load/capacity ratio (not hydraulic utilisation)
684th of 3,726by reported size among the 3,726 records with a size in the inventory · 0.03 % of the sum of those records (sum of records, not national capacity) · the largest plants in the country · how it is calculated
Treatmentprimary + secondary + tertiary (more stringent) (as reported to the EEA: PST) · reported levels
Nitrogen removalyes
Phosphorus removalyes
UV disinfectionnot reported
Statusactive
Reported coordinates40.4509, 17.7610 precision reported by the source: level 1 what it means
Source and yearEuropean Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · dataset record

REGULATORY REFERENCES

Referencia normativa: Italy

Regulatory framework of Italy · Directive (EU) 2024/3019: reported-capacity band 10,000 to 149,999 p.e.; obligations are set by agglomeration load, not by the capacity of this plant. Individual applicability is not determined in this profile.

SCENARIO

Reference energy scenario for this load estimate · simulator engine

429,917reference kWh per year for this load
52.0kWh per h-e (average load) per year
64,488€ per year at 0.15 €/kWh
42 %share of energy used for aeration

what this estimate is · Inputs: 11,973 p.e. of reported load; equivalent average load 8,263 p.e. with the reference profile of Italy (hypothesis with reported load and reference profile; not a measurement). Open this scenario in the simulator · how it is calculated and what it is not.

Reference scenario computed on the server from the reported load and the country profile; an estimate, not a measurement. The simulator recomputes it when opened.

WATER THAT COULD RETURN

Reuse potential

0.9estimated hm³ of treated water per year
tertiary treatment reporteda starting point for reclamation

what this estimate is · Volume estimated from the reported load (2,395 m³/day of reference), not measured or available for reclamation.

LOCATION

Italy: this plant on the map

this plant on the map · regional directory.

NEARBY PLANTS

Nearby wastewater treatment plants

PlantDistanceCapacity (h-e)Load 2022Treatment
San_pancrazio_salentino9.1 km14,0307,230primary, secondary and tertiary
Oria9.8 km22,4617,891primary, secondary and tertiary
Manduria10.8 km47,78917,045primary and secondary
Latiano12.8 km21,59912,017primary, secondary and tertiary
Sandonaci13.0 km7,7005,040primary, secondary and tertiary

Distances are between reported coordinates; proximity does not establish a hydraulic connection.

QUESTIONS

Frequently asked questions about this plant

What capacity does WWTP TORRE_SANTA_SUSANNA report?

Reported size: 28,749 h-e design capacity. Received load: 11,973 h-e. Units are retained without conversion.

What treatment is reported?

Treatment PST. Nitrogen, phosphorus and UV are shown only when explicitly reported.

How much energy would a reference plant use with the load of TORRE_SANTA_SUSANNA?

Aguas SB simulator reference scenario for 11,973 p.e. of reported load: 429,917 kWh per year (52.0 kWh per p.e. of average load), with aeration as 42 % of consumption. Estimate with the country reference profile; not a measurement of the plant.

SOURCE AND CORRECTIONS

Source

reported data · European Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · data 2022 · edition 2023 · source licence: CC BY 4.0 · JSON for this plant · suggest a correction · catalogue 2026-11-06. Reported data, not a current inspection; no compliance judgements.