WWTP UDINE_VIA_GONARS

Italy · official identifier IT06000000000020

200,000h-e design capacity (2022) · 73rd of 3,726 (tied with 5 others)

European Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · official identifier IT06000000000020 · reported size 200,000 h-e design capacity · received load 134,874 h-e · reported treatment: PST · data year 2022. 73rd of 3,726 records with reported size in the inventory of Italy (tied with 5 others); 0.19 % of the sum of those 3,726 records in h-e (sum of records, not national capacity); nearest inventoried plant at 3.6 km · 7 within 10 km. Reported data with their source; estimates are not measurements of the plant.

Aguas SB does not manage this wastewater treatment plant.

WHAT THE DATA REPORT

Reported data official data · 2022

200,000h-e design capacity
134,874h-e received load (2022)
67 %reported load/capacity ratio (not hydraulic utilisation)
73rd of 3,726by reported size among the 3,726 records with a size in the inventory (tied with 5 others) · 0.19 % of the sum of those records (sum of records, not national capacity) · the largest plants in the country · how it is calculated
Treatmentprimary + secondary + tertiary (more stringent) (as reported to the EEA: PST) · reported levels
Nitrogen removalyes
Phosphorus removalyes
UV disinfectionyes
Statusactive
Reported coordinates46.0252, 13.2366 precision reported by the source: level 2 what it means
Source and yearEuropean Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · dataset record

FUENTES PÚBLICAS

What public sources report

Documented milestones

  • 2023-01-31 · On 31 January 2023, the region renewed the integrated environmental permit for the Udine plant at Via Gonars 38 for 12 years. Friuli Venezia Giulia Region

Other published data

Mean annual volume treated reported in the 2022 cycle12,087,205 m³/year (2022) · source

Facts taken from public documents, with their date and link; an authorisation, a project or a planned capacity do not prove operation or quantities actually treated. Aguas SB editorial layer, lot L04; it does not change the official data.

REGULATORY REFERENCES

Referencia normativa: Italy

Regulatory framework of Italy · Directive (EU) 2024/3019: reported-capacity band 150,000 p.e. or more; obligations are set by agglomeration load, not by the capacity of this plant. Individual applicability is not determined in this profile.

SCENARIO

Reference energy scenario for this load estimate · simulator engine

3,662,919reference kWh per year for this load
39.4kWh per h-e (average load) per year
549,438€ per year at 0.15 €/kWh
50 %share of energy used for aeration

what this estimate is · Inputs: 134,874 p.e. of reported load; equivalent average load 93,064 p.e. with the reference profile of Italy (hypothesis with reported load and reference profile; not a measurement). Open this scenario in the simulator · how it is calculated and what it is not.

Reference scenario computed on the server from the reported load and the country profile; an estimate, not a measurement. The simulator recomputes it when opened.

WATER THAT COULD RETURN

Reuse potential

9.8estimated hm³ of treated water per year
tertiary treatment reporteda starting point for reclamation

what this estimate is · Volume estimated from the reported load (26,975 m³/day of reference), not measured or available for reclamation.

LOCATION

Italy: this plant on the map

this plant on the map · regional directory.

NEARBY PLANTS

Nearby wastewater treatment plants

PlantDistanceCapacity (h-e)Load 2022Treatment
Pozzuolo_terenzano3.6 km8,0005,611primary, secondary and tertiary
Pradamano_lovaria5.8 km6,0001,633primary, secondary and tertiary
Campoformido_capoluogo6.3 km4,5003,282primary, secondary and tertiary
Buttrio_loc._camino8.3 km5,0001,548primary, secondary and tertiary
Remanzacco_casali_battiferro8.7 km6,0003,623primary, secondary and tertiary

Distances are between reported coordinates; proximity does not establish a hydraulic connection.

QUESTIONS

Frequently asked questions about this plant

What capacity does WWTP UDINE_VIA_GONARS report?

Reported size: 200,000 h-e design capacity. Received load: 134,874 h-e. Units are retained without conversion.

What treatment is reported?

Treatment PST. Nitrogen, phosphorus and UV are shown only when explicitly reported.

How much energy would a reference plant use with the load of UDINE_VIA_GONARS?

Aguas SB simulator reference scenario for 134,874 p.e. of reported load: 3,662,919 kWh per year (39.4 kWh per p.e. of average load), with aeration as 50 % of consumption. Estimate with the country reference profile; not a measurement of the plant.

SOURCE AND CORRECTIONS

Source

reported data · European Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · data 2022 · edition 2023 · source licence: CC BY 4.0 · JSON for this plant · suggest a correction · catalogue 2026-11-06. Reported data, not a current inspection; no compliance judgements.