Worldwide wastewater treatment observatory · Latvia
Aguas SB Observatory · public data to understand water
WWTP BIO-400
Latvia · official identifier LV600272
3,414h-e design capacity (2022) · 53rd of 79
European Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · official identifier LV600272 · reported size 3,414 h-e design capacity · received load 438 h-e · reported treatment: PS · data year 2022. 53rd of 79 records with reported size in the inventory of Latvia; 0.16 % of the sum of those 79 records in h-e (sum of records, not national capacity); nearest inventoried plant at 4.1 km · 2 within 10 km. Reported data with their source; estimates are not measurements of the plant.
Aguas SB does not manage this wastewater treatment plant.
WHAT THE DATA REPORT
Reported data official data · 2022
| Treatment | primary + secondary (as reported to the EEA: PS) · reported levels |
|---|---|
| Nitrogen removal | not reported |
| Phosphorus removal | not reported |
| UV disinfection | not reported |
| Status | active |
| Reported coordinates | 56.6229, 25.1234 precision reported by the source: level 2 what it means |
| Source and year | European Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · dataset record |
REGULATORY REFERENCES
Referencia normativa: Latvia
Regulatory framework of Latvia · Directive (EU) 2024/3019: reported-capacity band 1,000 to 9,999 p.e.; obligations are set by agglomeration load, not by the capacity of this plant. Individual applicability is not determined in this profile.
SCENARIO
Reference energy scenario for this load estimate · simulator engine
what this estimate is · Inputs: 438 p.e. of reported load; equivalent average load 436 p.e. with the reference profile of Latvia (hypothesis with reported load and reference profile; not a measurement). Open this scenario in the simulator · how it is calculated and what it is not.
Reference scenario computed on the server from the reported load and the country profile; an estimate, not a measurement. The simulator recomputes it when opened.
WATER THAT COULD RETURN
Reuse potential
what this estimate is · Volume estimated from the reported load (72 m³/day of reference), not measured or available for reclamation.
NEARBY PLANTS
Nearby wastewater treatment plants
| Plant | Distance | Capacity (h-e) | Load 2022 | Treatment |
|---|---|---|---|---|
| Bio-100 | 4.1 km | 356 | 126 | primary and secondary |
| Pu ""aizkraukles Ūdens"" Bio-4050 | 7.6 km | 10,683 | 5,666 | primary, secondary and tertiary |
| Pu ""remte"" | 21.8 km | 10,000 | 6,121 | primary and secondary |
| Pu ""ķeguma Stars"" | 30.3 km | 2,487 | 614 | primary and secondary |
| Pļaviņu Pilsētas Nai | 34.7 km | 3,997 | 711 | primary and secondary |
Distances are between reported coordinates; proximity does not establish a hydraulic connection.
QUESTIONS
Frequently asked questions about this plant
What capacity does WWTP BIO-400 report?
Reported size: 3,414 h-e design capacity. Received load: 438 h-e. Units are retained without conversion.
What treatment is reported?
Treatment PS. Nitrogen, phosphorus and UV are shown only when explicitly reported.
How much energy would a reference plant use with the load of BIO-400?
Aguas SB simulator reference scenario for 438 p.e. of reported load: 25,206 kWh per year (57.9 kWh per p.e. of average load), with aeration as 58 % of consumption. Estimate with the country reference profile; not a measurement of the plant.
SOURCE AND CORRECTIONS
Source
reported data · European Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · data 2022 · edition 2023 · source licence: CC BY 4.0 · JSON for this plant · suggest a correction · catalogue 2026-11-06. Reported data, not a current inspection; no compliance judgements.