Worldwide wastewater treatment observatory · Latvia
Aguas SB Observatory · public data to understand water
WWTP Jaunpiebalgas NAI
Latvia · official identifier LV500493
2,000h-e design capacity (2022) · 64th of 79 (tied with 2 others)
European Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · official identifier LV500493 · reported size 2,000 h-e design capacity · received load 2,267 h-e · reported treatment: PS · data year 2022. 64th of 79 records with reported size in the inventory of Latvia (tied with 2 others); 0.10 % of the sum of those 79 records in h-e (sum of records, not national capacity); nearest inventoried plant at 31.8 km. Reported data with their source; estimates are not measurements of the plant.
Aguas SB does not manage this wastewater treatment plant.
WHAT THE DATA REPORT
Reported data official data · 2022
| Treatment | primary + secondary (as reported to the EEA: PS) · reported levels |
|---|---|
| Nitrogen removal | not reported |
| Phosphorus removal | not reported |
| UV disinfection | not reported |
| Status | active |
| Reported coordinates | 57.1858, 26.0550 precision reported by the source: level 1 what it means |
| Source and year | European Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · dataset record |
REGULATORY REFERENCES
Referencia normativa: Latvia
Regulatory framework of Latvia · Directive (EU) 2024/3019: reported-capacity band 1,000 to 9,999 p.e.; obligations are set by agglomeration load, not by the capacity of this plant. Individual applicability is not determined in this profile.
SCENARIO
Reference energy scenario for this load estimate · simulator engine
what this estimate is · Inputs: 2,267 p.e. of reported load; equivalent average load 2,263 p.e. with the reference profile of Latvia (hypothesis with reported load and reference profile; not a measurement). Open this scenario in the simulator · how it is calculated and what it is not.
Reference scenario computed on the server from the reported load and the country profile; an estimate, not a measurement. The simulator recomputes it when opened.
WATER THAT COULD RETURN
Reuse potential
what this estimate is · Volume estimated from the reported load (374 m³/day of reference), not measured or available for reclamation.
NEARBY PLANTS
Nearby wastewater treatment plants
| Plant | Distance | Capacity (h-e) | Load 2022 | Treatment |
|---|---|---|---|---|
| Nai ""abuls"" | 31.8 km | 9,950 | 7,526 | primary and secondary |
| As ""madonas Ūdens"" | 38.1 km | 10,000 | 5,601 | primary, secondary and tertiary |
| Ērgļu Nai Bio Q-400 | 40.0 km | 3,310 | 533 | primary and secondary |
| Sia ""alba"" | 43.4 km | 10,000 | 5,193 | primary and secondary |
| Liepas Ciema Nai | 45.4 km | 2,000 | 1,552 | primary and secondary |
Distances are between reported coordinates; proximity does not establish a hydraulic connection.
QUESTIONS
Frequently asked questions about this plant
What capacity does WWTP Jaunpiebalgas NAI report?
Reported size: 2,000 h-e design capacity. Received load: 2,267 h-e. Units are retained without conversion.
What treatment is reported?
Treatment PS. Nitrogen, phosphorus and UV are shown only when explicitly reported.
How much energy would a reference plant use with the load of Jaunpiebalgas NAI?
Aguas SB simulator reference scenario for 2,267 p.e. of reported load: 104,994 kWh per year (46.4 kWh per p.e. of average load), with aeration as 71 % of consumption. Estimate with the country reference profile; not a measurement of the plant.
SOURCE AND CORRECTIONS
Source
reported data · European Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · data 2022 · edition 2023 · source licence: CC BY 4.0 · JSON for this plant · suggest a correction · catalogue 2026-11-06. Reported data, not a current inspection; no compliance judgements.