Worldwide wastewater treatment observatory · Latvia
Aguas SB Observatory · public data to understand water
WWTP Kuldīgas NAI
Latvia · official identifier LV400099
7,500h-e design capacity (2022) · 38th of 79
European Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · official identifier LV400099 · reported size 7,500 h-e design capacity · received load 13,499 h-e · reported treatment: PS · data year 2022. 38th of 79 records with reported size in the inventory of Latvia; 0.36 % of the sum of those 79 records in h-e (sum of records, not national capacity); nearest inventoried plant at 32.2 km. Reported data with their source; estimates are not measurements of the plant.
Aguas SB does not manage this wastewater treatment plant.
WHAT THE DATA REPORT
Reported data official data · 2022
| Treatment | primary + secondary (as reported to the EEA: PS) · reported levels |
|---|---|
| Nitrogen removal | not reported |
| Phosphorus removal | not reported |
| UV disinfection | not reported |
| Status | active |
| Reported coordinates | 56.9870, 21.9652 precision reported by the source: level 1 what it means |
| Source and year | European Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · dataset record |
REGULATORY REFERENCES
Referencia normativa: Latvia
Regulatory framework of Latvia · Directive (EU) 2024/3019: reported-capacity band 1,000 to 9,999 p.e.; obligations are set by agglomeration load, not by the capacity of this plant. Individual applicability is not determined in this profile.
SCENARIO
Reference energy scenario for this load estimate · simulator engine
what this estimate is · Inputs: 13,499 p.e. of reported load; equivalent average load 13,473 p.e. with the reference profile of Latvia (hypothesis with reported load and reference profile; not a measurement). Open this scenario in the simulator · how it is calculated and what it is not.
Reference scenario computed on the server from the reported load and the country profile; an estimate, not a measurement. The simulator recomputes it when opened.
WATER THAT COULD RETURN
Reuse potential
what this estimate is · Volume estimated from the reported load (2,227 m³/day of reference), not measured or available for reclamation.
NEARBY PLANTS
Nearby wastewater treatment plants
| Plant | Distance | Capacity (h-e) | Load 2022 | Treatment |
|---|---|---|---|---|
| Piltenes Komunālā Saimniecība | 32.2 km | 1,000 | 2,901 | primary and secondary |
| Skrundas Pilsētas Nai | 34.9 km | 480 | 1,188 | primary and secondary |
| Aizputes Nai | 36.3 km | 7,980 | 2,460 | primary and secondary |
| Talsu Pilsētas Bioloģiskās Nai | 43.5 km | 47,500 | 24,715 | primary, secondary and tertiary |
| Druvas Centra Nai | 44.0 km | 1,300 | 2,323 | primary and secondary |
Distances are between reported coordinates; proximity does not establish a hydraulic connection.
QUESTIONS
Frequently asked questions about this plant
What capacity does WWTP Kuldīgas NAI report?
Reported size: 7,500 h-e design capacity. Received load: 13,499 h-e. Units are retained without conversion.
What treatment is reported?
Treatment PS. Nitrogen, phosphorus and UV are shown only when explicitly reported.
How much energy would a reference plant use with the load of Kuldīgas NAI?
Aguas SB simulator reference scenario for 13,499 p.e. of reported load: 547,804 kWh per year (40.7 kWh per p.e. of average load), with aeration as 52 % of consumption. Estimate with the country reference profile; not a measurement of the plant.
SOURCE AND CORRECTIONS
Source
reported data · European Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · data 2022 · edition 2023 · source licence: CC BY 4.0 · JSON for this plant · suggest a correction · catalogue 2026-11-06. Reported data, not a current inspection; no compliance judgements.