Worldwide wastewater treatment observatory · Latvia
Aguas SB Observatory · public data to understand water
WWTP SIA ""Tukuma ūdens""
Latvia · official identifier LV300211
30,000h-e design capacity (2022) · 10th of 79 (tied with 1 others)
European Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · official identifier LV300211 · reported size 30,000 h-e design capacity · received load 29,083 h-e · reported treatment: PST · data year 2022. 10th of 79 records with reported size in the inventory of Latvia (tied with 1 others); 1.4 % of the sum of those 79 records in h-e (sum of records, not national capacity); nearest inventoried plant at 26.1 km. Reported data with their source; estimates are not measurements of the plant.
Aguas SB does not manage this wastewater treatment plant.
WHAT THE DATA REPORT
Reported data official data · 2022
| Treatment | primary + secondary + tertiary (more stringent) (as reported to the EEA: PST) · reported levels |
|---|---|
| Nitrogen removal | yes |
| Phosphorus removal | yes |
| UV disinfection | not reported |
| Status | active |
| Reported coordinates | 56.9764, 23.1923 precision reported by the source: level 2 what it means |
| Source and year | European Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · dataset record |
REGULATORY REFERENCES
Referencia normativa: Latvia
Regulatory framework of Latvia · Directive (EU) 2024/3019: reported-capacity band 10,000 to 149,999 p.e.; obligations are set by agglomeration load, not by the capacity of this plant. Individual applicability is not determined in this profile.
SCENARIO
Reference energy scenario for this load estimate · simulator engine
what this estimate is · Inputs: 29,083 p.e. of reported load; equivalent average load 29,034 p.e. with the reference profile of Latvia (hypothesis with reported load and reference profile; not a measurement). Open this scenario in the simulator · how it is calculated and what it is not.
Reference scenario computed on the server from the reported load and the country profile; an estimate, not a measurement. The simulator recomputes it when opened.
WATER THAT COULD RETURN
Reuse potential
what this estimate is · Volume estimated from the reported load (4,799 m³/day of reference), not measured or available for reclamation.
NEARBY PLANTS
Nearby wastewater treatment plants
| Plant | Distance | Capacity (h-e) | Load 2022 | Treatment |
|---|---|---|---|---|
| Pu ""kandavas Pilsētas Komunālais Uzņēmums"" Lielā Iela 38 | 26.1 km | 10,000 | 1,896 | primary and secondary |
| Sia ""jūrmalas Ūdens"", Mežmalas 41, Jūrmala | 28.1 km | 35,400 | 29,299 | primary, secondary and tertiary |
| Jaunpils Pagasta Padome | 28.8 km | 1,875 | 2,478 | primary and secondary |
| Pbu ""dobeles Ūdens"" | 41.1 km | 20,414 | 11,440 | primary, secondary and tertiary |
| Pu ""babītes Siltums"" | 45.8 km | 7,300 | 7,239 | primary and secondary |
Distances are between reported coordinates; proximity does not establish a hydraulic connection.
QUESTIONS
Frequently asked questions about this plant
What capacity does WWTP SIA ""Tukuma ūdens"" report?
Reported size: 30,000 h-e design capacity. Received load: 29,083 h-e. Units are retained without conversion.
What treatment is reported?
Treatment PST. Nitrogen, phosphorus and UV are shown only when explicitly reported.
How much energy would a reference plant use with the load of SIA ""Tukuma ūdens""?
Aguas SB simulator reference scenario for 29,083 p.e. of reported load: 1,173,059 kWh per year (40.4 kWh per p.e. of average load), with aeration as 57 % of consumption. Estimate with the country reference profile; not a measurement of the plant.
SOURCE AND CORRECTIONS
Source
reported data · European Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · data 2022 · edition 2023 · source licence: CC BY 4.0 · JSON for this plant · suggest a correction · catalogue 2026-11-06. Reported data, not a current inspection; no compliance judgements.