Worldwide wastewater treatment observatory · Lithuania
Aguas SB Observatory · public data to understand water
WWTP Jonavos nuoteku valykla
Lithuania · official identifier LT-AG-013-WWTP-01
34,000h-e design capacity (2022) · 18th of 60
European Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · official identifier LT-AG-013-WWTP-01 · reported size 34,000 h-e design capacity · received load 22,774 h-e · reported treatment: PST · data year 2022. 18th of 60 records with reported size in the inventory of Lithuania; 0.97 % of the sum of those 60 records in h-e (sum of records, not national capacity); nearest inventoried plant at 8.1 km · 1 within 10 km. Reported data with their source; estimates are not measurements of the plant.
Aguas SB does not manage this wastewater treatment plant.
WHAT THE DATA REPORT
Reported data official data · 2022
| Treatment | primary + secondary + tertiary (more stringent) (as reported to the EEA: PST) · reported levels |
|---|---|
| Nitrogen removal | yes |
| Phosphorus removal | yes |
| UV disinfection | not reported |
| Status | active |
| Reported coordinates | 55.0673, 24.2557 precision reported by the source: level 2 what it means |
| Source and year | European Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · dataset record |
REGULATORY REFERENCES
Referencia normativa: Lithuania
Regulatory framework of Lithuania · Directive (EU) 2024/3019: reported-capacity band 10,000 to 149,999 p.e.; obligations are set by agglomeration load, not by the capacity of this plant. Individual applicability is not determined in this profile.
SCENARIO
Reference energy scenario for this load estimate · simulator engine
what this estimate is · Inputs: 22,774 p.e. of reported load; equivalent average load 22,733 p.e. with the reference profile of Lithuania (hypothesis with reported load and reference profile; not a measurement). Open this scenario in the simulator · how it is calculated and what it is not.
Reference scenario computed on the server from the reported load and the country profile; an estimate, not a measurement. The simulator recomputes it when opened.
WATER THAT COULD RETURN
Reuse potential
what this estimate is · Volume estimated from the reported load (4,236 m³/day of reference), not measured or available for reclamation.
NEARBY PLANTS
Nearby wastewater treatment plants
| Plant | Distance | Capacity (h-e) | Load 2022 | Treatment |
|---|---|---|---|---|
| Ruklos Nuoteku Valykla | 8.1 km | 7,400 | 5,962 | primary, secondary and tertiary |
| Pravieniskiu Nuoteku Valykla | 16.4 km | 10,589 | 4,111 | primary and secondary |
| Kaisiadoriu Nuoteku Valykla | 24.9 km | 20,000 | 12,255 | primary, secondary and tertiary |
| Kedainiu Nuoteku Valykla | 29.5 km | 42,000 | 42,927 | primary, secondary and tertiary |
| Ziezmariu Nuoteku Valykla | 31.6 km | 6,200 | 4,813 | primary and secondary |
Distances are between reported coordinates; proximity does not establish a hydraulic connection.
QUESTIONS
Frequently asked questions about this plant
What capacity does WWTP Jonavos nuoteku valykla report?
Reported size: 34,000 h-e design capacity. Received load: 22,774 h-e. Units are retained without conversion.
What treatment is reported?
Treatment PST. Nitrogen, phosphorus and UV are shown only when explicitly reported.
How much energy would a reference plant use with the load of Jonavos nuoteku valykla?
Aguas SB simulator reference scenario for 22,774 p.e. of reported load: 969,849 kWh per year (42.7 kWh per p.e. of average load), with aeration as 55 % of consumption. Estimate with the country reference profile; not a measurement of the plant.
SOURCE AND CORRECTIONS
Source
reported data · European Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · data 2022 · edition 2023 · source licence: CC BY 4.0 · JSON for this plant · suggest a correction · catalogue 2026-11-06. Reported data, not a current inspection; no compliance judgements.