Worldwide wastewater treatment observatory · Lithuania

Aguas SB Observatory · public data to understand water

WWTP Nemencines nuoteku valykla

Lithuania · official identifier LT-AG-048-WWTP-01

8,000h-e design capacity (2022) · 50th of 60 (tied with 1 others)

European Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · official identifier LT-AG-048-WWTP-01 · reported size 8,000 h-e design capacity · received load 12,913 h-e · reported treatment: PS · data year 2022. 50th of 60 records with reported size in the inventory of Lithuania (tied with 1 others); 0.23 % of the sum of those 60 records in h-e (sum of records, not national capacity); nearest inventoried plant at 21.5 km. Reported data with their source; estimates are not measurements of the plant.

Aguas SB does not manage this wastewater treatment plant.

WHAT THE DATA REPORT

Reported data official data · 2022

8,000h-e design capacity
12,913h-e received load (2022)
161 %reported load/capacity ratio (not hydraulic utilisation)
50th of 60by reported size among the 60 records with a size in the inventory (tied with 1 others) · 0.23 % of the sum of those records (sum of records, not national capacity) · the largest plants in the country · how it is calculated
Treatmentprimary + secondary (as reported to the EEA: PS) · reported levels
Nitrogen removalnot reported
Phosphorus removalnot reported
UV disinfectionnot reported
Statusactive
Reported coordinates54.8637, 25.4440 precision reported by the source: level 1 what it means
Source and yearEuropean Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · dataset record

REGULATORY REFERENCES

Referencia normativa: Lithuania

Regulatory framework of Lithuania · Directive (EU) 2024/3019: reported-capacity band 1,000 to 9,999 p.e.; obligations are set by agglomeration load, not by the capacity of this plant. Individual applicability is not determined in this profile.

SCENARIO

Reference energy scenario for this load estimate · simulator engine

552,776reference kWh per year for this load
42.9kWh per h-e (average load) per year
82,916€ per year at 0.15 €/kWh
50 %share of energy used for aeration

what this estimate is · Inputs: 12,913 p.e. of reported load; equivalent average load 12,891 p.e. with the reference profile of Lithuania (hypothesis with reported load and reference profile; not a measurement). Open this scenario in the simulator · how it is calculated and what it is not.

Reference scenario computed on the server from the reported load and the country profile; an estimate, not a measurement. The simulator recomputes it when opened.

WATER THAT COULD RETURN

Reuse potential

0.9estimated hm³ of treated water per year
tertiary treatment not reportedreclamation requires additional treatment

what this estimate is · Volume estimated from the reported load (2,402 m³/day of reference), not measured or available for reclamation.

LOCATION

Lithuania: this plant on the map

this plant on the map · regional directory.

NEARBY PLANTS

Nearby wastewater treatment plants

PlantDistanceCapacity (h-e)Load 2022Treatment
Pabrades Nuoteku Valykla21.5 km4,6007,709primary, secondary and tertiary
Vilniaus Nuoteku Valykla27.8 km740,000828,209primary, secondary and tertiary
Skaidiskiu Nuoteku Valykla28.6 km9,00010,198primary, secondary and tertiary
Traku-Lentvario Nuoteku Valykla33.9 km19,00012,376primary, secondary and tertiary
Sirvintu Nuoteku Valykla38.5 km14,0005,067primary, secondary and tertiary

Distances are between reported coordinates; proximity does not establish a hydraulic connection.

QUESTIONS

Frequently asked questions about this plant

What capacity does WWTP Nemencines nuoteku valykla report?

Reported size: 8,000 h-e design capacity. Received load: 12,913 h-e. Units are retained without conversion.

What treatment is reported?

Treatment PS. Nitrogen, phosphorus and UV are shown only when explicitly reported.

How much energy would a reference plant use with the load of Nemencines nuoteku valykla?

Aguas SB simulator reference scenario for 12,913 p.e. of reported load: 552,776 kWh per year (42.9 kWh per p.e. of average load), with aeration as 50 % of consumption. Estimate with the country reference profile; not a measurement of the plant.

SOURCE AND CORRECTIONS

Source

reported data · European Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · data 2022 · edition 2023 · source licence: CC BY 4.0 · JSON for this plant · suggest a correction · catalogue 2026-11-06. Reported data, not a current inspection; no compliance judgements.