Worldwide wastewater treatment observatory · Lithuania

Aguas SB Observatory · public data to understand water

WWTP Panevezio nuoteku valykla

Lithuania · official identifier LT-AG-005-WWTP-01

292,000h-e design capacity (2022) · 4th of 60

European Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · official identifier LT-AG-005-WWTP-01 · reported size 292,000 h-e design capacity · received load 192,239 h-e · reported treatment: PST · data year 2022. 4th of 60 records with reported size in the inventory of Lithuania; 8.3 % of the sum of those 60 records in h-e (sum of records, not national capacity); nearest inventoried plant at 41.0 km. Reported data with their source; estimates are not measurements of the plant.

Aguas SB does not manage this wastewater treatment plant.

WHAT THE DATA REPORT

Reported data official data · 2022

292,000h-e design capacity
192,239h-e received load (2022)
66 %reported load/capacity ratio (not hydraulic utilisation)
4th of 60by reported size among the 60 records with a size in the inventory · 8.3 % of the sum of those records (sum of records, not national capacity) · the largest plants in the country · how it is calculated
Treatmentprimary + secondary + tertiary (more stringent) (as reported to the EEA: PST) · reported levels
Nitrogen removalyes
Phosphorus removalyes
UV disinfectionnot reported
Statusactive
Reported coordinates55.7105, 24.2165 precision reported by the source: level 2 what it means
Source and yearEuropean Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · dataset record

FUENTES PÚBLICAS

What public sources report

Documented milestones

Other published data

Mean annual volume treated reported in the 2022 cycle13,182,700 m³/year (2022) · source

Facts taken from public documents, with their date and link; an authorisation, a project or a planned capacity do not prove operation or quantities actually treated. Aguas SB editorial layer, lot L03; it does not change the official data.

REGULATORY REFERENCES

Referencia normativa: Lithuania

Regulatory framework of Lithuania · Directive (EU) 2024/3019: reported-capacity band 150,000 p.e. or more; obligations are set by agglomeration load, not by the capacity of this plant. Individual applicability is not determined in this profile.

SCENARIO

Reference energy scenario for this load estimate · simulator engine

5,757,818reference kWh per year for this load
30.0kWh per h-e (average load) per year
863,673€ per year at 0.15 €/kWh
61 %share of energy used for aeration

what this estimate is · Inputs: 192,239 p.e. of reported load; equivalent average load 191,891 p.e. with the reference profile of Lithuania (hypothesis with reported load and reference profile; not a measurement). Open this scenario in the simulator · how it is calculated and what it is not.

Reference scenario computed on the server from the reported load and the country profile; an estimate, not a measurement. The simulator recomputes it when opened.

WATER THAT COULD RETURN

Reuse potential

13.1estimated hm³ of treated water per year
tertiary treatment reporteda starting point for reclamation

what this estimate is · Volume estimated from the reported load (35,756 m³/day of reference), not measured or available for reclamation.

LOCATION

Lithuania: this plant on the map

this plant on the map · regional directory.

NEARBY PLANTS

Nearby wastewater treatment plants

PlantDistanceCapacity (h-e)Load 2022Treatment
Pakruojo Nuoteku Valykla41.0 km11,0005,514primary, secondary and tertiary
Pasvalio Nuoteku Valykla42.5 km59,00045,848primary, secondary and tertiary
Radviliskio Nuoteku Valykla43.8 km17,0009,986primary, secondary and tertiary
Kupiskio Nuoteku Valykla47.4 km11,2003,291primary, secondary and tertiary
Kedainiu Nuoteku Valykla52.3 km42,00042,927primary, secondary and tertiary

Distances are between reported coordinates; proximity does not establish a hydraulic connection.

QUESTIONS

Frequently asked questions about this plant

What capacity does WWTP Panevezio nuoteku valykla report?

Reported size: 292,000 h-e design capacity. Received load: 192,239 h-e. Units are retained without conversion.

What treatment is reported?

Treatment PST. Nitrogen, phosphorus and UV are shown only when explicitly reported.

How much energy would a reference plant use with the load of Panevezio nuoteku valykla?

Aguas SB simulator reference scenario for 192,239 p.e. of reported load: 5,757,818 kWh per year (30.0 kWh per p.e. of average load), with aeration as 61 % of consumption. Estimate with the country reference profile; not a measurement of the plant.

SOURCE AND CORRECTIONS

Source

reported data · European Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · data 2022 · edition 2023 · source licence: CC BY 4.0 · JSON for this plant · suggest a correction · catalogue 2026-11-06. Reported data, not a current inspection; no compliance judgements.