Worldwide wastewater treatment observatory · Netherlands

Aguas SB Observatory · public data to understand water

WWTP UWWTP GROOTE LUCHT

Netherlands · official identifier NL15007

176,700h-e design capacity (2022) · 28th of 315

European Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · official identifier NL15007 · reported size 176,700 h-e design capacity · received load 172,143 h-e · reported treatment: PST · data year 2022. 28th of 315 records with reported size in the inventory of Netherlands; 0.83 % of the sum of those 315 records in h-e (sum of records, not national capacity); nearest inventoried plant at 3.6 km · 4 within 10 km. Reported data with their source; estimates are not measurements of the plant.

Aguas SB does not manage this wastewater treatment plant.

WHAT THE DATA REPORT

Reported data official data · 2022

176,700h-e design capacity
172,143h-e received load (2022)
97 %reported load/capacity ratio (not hydraulic utilisation)
28th of 315by reported size among the 315 records with a size in the inventory · 0.83 % of the sum of those records (sum of records, not national capacity) · the largest plants in the country · how it is calculated
Treatmentprimary + secondary + tertiary (more stringent) (as reported to the EEA: PST) · reported levels
Nitrogen removalyes
Phosphorus removalyes
UV disinfectionnot reported
Statusactive
Reported coordinates51.9000, 4.3031 precision reported by the source: level 2 what it means
Source and yearEuropean Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · dataset record

FUENTES PÚBLICAS

What public sources report

Documented milestones

  • 2026-02 · In February 2026, Delfland approved a pilot study of a sludge treatment method at De Groote Lucht wastewater treatment plant. Delfland Water Authority

Facts taken from public documents, with their date and link; an authorisation, a project or a planned capacity do not prove operation or quantities actually treated. Aguas SB editorial layer, lot L06; it does not change the official data.

REGULATORY REFERENCES

Referencia normativa: Netherlands

Regulatory framework of Netherlands · Directive (EU) 2024/3019: reported-capacity band 150,000 p.e. or more; obligations are set by agglomeration load, not by the capacity of this plant. Individual applicability is not determined in this profile.

SCENARIO

Reference energy scenario for this load estimate · simulator engine

5,837,214reference kWh per year for this load
33.9kWh per h-e (average load) per year
875,582€ per year at 0.15 €/kWh
55 %share of energy used for aeration

what this estimate is · Inputs: 172,143 p.e. of reported load; equivalent average load 171,937 p.e. with the reference profile of Netherlands (hypothesis with reported load and reference profile; not a measurement). Open this scenario in the simulator · how it is calculated and what it is not.

Reference scenario computed on the server from the reported load and the country profile; an estimate, not a measurement. The simulator recomputes it when opened.

WATER THAT COULD RETURN

Reuse potential

16.6estimated hm³ of treated water per year
tertiary treatment reporteda starting point for reclamation

what this estimate is · Volume estimated from the reported load (45,446 m³/day of reference), not measured or available for reclamation.

LOCATION

Netherlands: this plant on the map

this plant on the map · regional directory.

NEARBY PLANTS

Nearby wastewater treatment plants

PlantDistanceCapacity (h-e)Load 2022Treatment
Uwwtp Hoogvliet3.6 km62,50050,900primary, secondary and tertiary
Uwwtp Heenvliet5.1 km8,1844,933primary, secondary and tertiary
Uwwtp Rozenburg5.6 km16,2008,700primary, secondary and tertiary
Uwwtp Spijkenisse7.7 km70,83473,366primary, secondary and tertiary
Uwwtp Hellevoetsluis10.8 km75,00052,100primary, secondary and tertiary

Distances are between reported coordinates; proximity does not establish a hydraulic connection.

QUESTIONS

Frequently asked questions about this plant

What capacity does WWTP UWWTP GROOTE LUCHT report?

Reported size: 176,700 h-e design capacity. Received load: 172,143 h-e. Units are retained without conversion.

What treatment is reported?

Treatment PST. Nitrogen, phosphorus and UV are shown only when explicitly reported.

How much energy would a reference plant use with the load of UWWTP GROOTE LUCHT?

Aguas SB simulator reference scenario for 172,143 p.e. of reported load: 5,837,214 kWh per year (33.9 kWh per p.e. of average load), with aeration as 55 % of consumption. Estimate with the country reference profile; not a measurement of the plant.

SOURCE AND CORRECTIONS

Source

reported data · European Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · data 2022 · edition 2023 · source licence: CC BY 4.0 · JSON for this plant · suggest a correction · catalogue 2026-11-06. Reported data, not a current inspection; no compliance judgements.