WWTP UWWTP OIJEN

Netherlands · official identifier NL29002

270,000h-e design capacity (2022) · 12th of 315

European Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · official identifier NL29002 · reported size 270,000 h-e design capacity · received load 204,716 h-e · reported treatment: PST · data year 2022. 12th of 315 records with reported size in the inventory of Netherlands; 1.3 % of the sum of those 315 records in h-e (sum of records, not national capacity); nearest inventoried plant at 3.1 km · 2 within 10 km. Reported data with their source; estimates are not measurements of the plant.

Aguas SB does not manage this wastewater treatment plant.

WHAT THE DATA REPORT

Reported data official data · 2022

270,000h-e design capacity
204,716h-e received load (2022)
76 %reported load/capacity ratio (not hydraulic utilisation)
12th of 315by reported size among the 315 records with a size in the inventory · 1.3 % of the sum of those records (sum of records, not national capacity) · the largest plants in the country · how it is calculated
Treatmentprimary + secondary + tertiary (more stringent) (as reported to the EEA: PST) · reported levels
Nitrogen removalyes
Phosphorus removalyes
UV disinfectionnot reported
Statusactive
Reported coordinates51.8120, 5.4882 precision reported by the source: level 2 what it means
Source and yearEuropean Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · dataset record

FUENTES PÚBLICAS

What public sources report

Documented milestones

  • 2023-11-02 · In November 2023 a draft decision on renovating the Oijen wastewater treatment plant on Parallelstraat was published. Province of North Brabant

Other published data

Mean annual volume treated reported in the 2022 cycle17,783,040 m³/year (2022) · source

Facts taken from public documents, with their date and link; an authorisation, a project or a planned capacity do not prove operation or quantities actually treated. Aguas SB editorial layer, lot L04; it does not change the official data.

REGULATORY REFERENCES

Referencia normativa: Netherlands

Regulatory framework of Netherlands · Directive (EU) 2024/3019: reported-capacity band 150,000 p.e. or more; obligations are set by agglomeration load, not by the capacity of this plant. Individual applicability is not determined in this profile.

SCENARIO

Reference energy scenario for this load estimate · simulator engine

6,842,680reference kWh per year for this load
33.5kWh per h-e (average load) per year
1,026,402€ per year at 0.15 €/kWh
56 %share of energy used for aeration

what this estimate is · Inputs: 204,716 p.e. of reported load; equivalent average load 204,470 p.e. with the reference profile of Netherlands (hypothesis with reported load and reference profile; not a measurement). Open this scenario in the simulator · how it is calculated and what it is not.

Reference scenario computed on the server from the reported load and the country profile; an estimate, not a measurement. The simulator recomputes it when opened.

WATER THAT COULD RETURN

Reuse potential

19.7estimated hm³ of treated water per year
tertiary treatment reporteda starting point for reclamation

what this estimate is · Volume estimated from the reported load (54,045 m³/day of reference), not measured or available for reclamation.

LOCATION

Netherlands: this plant on the map

this plant on the map · regional directory.

NEARBY PLANTS

Nearby wastewater treatment plants

PlantDistanceCapacity (h-e)Load 2022Treatment
Uwwtp Maasbommel3.1 km5,0402,633primary, secondary and tertiary
Uwwtp Dreumel3.8 km6,7505,550primary, secondary and tertiary
Uwwtp Bergharen11.3 km9,0005,500primary, secondary and tertiary
Uwwtp Druten11.4 km31,50032,100primary, secondary and tertiary
Uwwtp Tiel12.3 km76,50066,350primary, secondary and tertiary

Distances are between reported coordinates; proximity does not establish a hydraulic connection.

QUESTIONS

Frequently asked questions about this plant

What capacity does WWTP UWWTP OIJEN report?

Reported size: 270,000 h-e design capacity. Received load: 204,716 h-e. Units are retained without conversion.

What treatment is reported?

Treatment PST. Nitrogen, phosphorus and UV are shown only when explicitly reported.

How much energy would a reference plant use with the load of UWWTP OIJEN?

Aguas SB simulator reference scenario for 204,716 p.e. of reported load: 6,842,680 kWh per year (33.5 kWh per p.e. of average load), with aeration as 56 % of consumption. Estimate with the country reference profile; not a measurement of the plant.

SOURCE AND CORRECTIONS

Source

reported data · European Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · data 2022 · edition 2023 · source licence: CC BY 4.0 · JSON for this plant · suggest a correction · catalogue 2026-11-06. Reported data, not a current inspection; no compliance judgements.