Worldwide wastewater treatment observatory · Norway

Aguas SB Observatory · public data to understand water

WWTP Aker Stord I, Eldøyane

Norway · official identifier NO4614.0058.01

1,000h-e design capacity (2022) · 247th of 340 (tied with 1 others)

European Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · official identifier NO4614.0058.01 · reported size 1,000 h-e design capacity · received load 950 h-e · reported treatment: P · data year 2022. 247th of 340 records with reported size in the inventory of Norway (tied with 1 others); 0.01 % of the sum of those 340 records in h-e (sum of records, not national capacity); nearest inventoried plant at 1.3 km · 9 within 10 km. Reported data with their source; estimates are not measurements of the plant.

Aguas SB does not manage this wastewater treatment plant.

WHAT THE DATA REPORT

Reported data official data · 2022

1,000h-e design capacity
950h-e received load (2022)
95 %reported load/capacity ratio (not hydraulic utilisation)
247th of 340by reported size among the 340 records with a size in the inventory (tied with 1 others) · 0.01 % of the sum of those records (sum of records, not national capacity) · the largest plants in the country · how it is calculated
Treatmentprimario (as reported to the EEA: P) · reported levels
Nitrogen removalnot reported
Phosphorus removalnot reported
UV disinfectionnot reported
Statusactive
Reported coordinates59.7560, 5.4904 precision reported by the source: level 2 what it means
Source and yearEuropean Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · dataset record

REGULATORY REFERENCES

Referencia normativa: Norway

Regulatory framework of Norway. Individual applicability is not determined in this profile.

SCENARIO

Reference energy scenario for this load estimate · simulator engine

43,972reference kWh per year for this load
59.3kWh per h-e (average load) per year
6,596€ per year at 0.15 €/kWh
58 %share of energy used for aeration

what this estimate is · Inputs: 950 p.e. of reported load; equivalent average load 741 p.e. with the reference profile of Norway (hypothesis with reported load and reference profile; not a measurement). Open this scenario in the simulator · how it is calculated and what it is not.

Reference scenario computed on the server from the reported load and the country profile; an estimate, not a measurement. The simulator recomputes it when opened.

WATER THAT COULD RETURN

Reuse potential

0.1estimated hm³ of treated water per year
tertiary treatment not reportedreclamation requires additional treatment

what this estimate is · Volume estimated from the reported load (190 m³/day of reference), not measured or available for reclamation.

LOCATION

Norway: this plant on the map

this plant on the map · regional directory.

NEARBY PLANTS

Nearby wastewater treatment plants

PlantDistanceCapacity (h-e)Load 2022Treatment
Aker Stord Ii, Kjøtteinståa1.3 km1,000700primary and secondary
Skjersholmane Reinseanlegg1.9 km6,7003,348primary
Bjelland, Utslipp 5.01 -5.031.9 km2,2501,126not reported
Djupavik2.7 km4,2003,522primary
Sætravik, Utslepp 5.01-5.03 Avløpsanlegg5.4 km400196not reported

Distances are between reported coordinates; proximity does not establish a hydraulic connection.

QUESTIONS

Frequently asked questions about this plant

What capacity does WWTP Aker Stord I, Eldøyane report?

Reported size: 1,000 h-e design capacity. Received load: 950 h-e. Units are retained without conversion.

What treatment is reported?

Treatment P. Nitrogen, phosphorus and UV are shown only when explicitly reported.

How much energy would a reference plant use with the load of Aker Stord I, Eldøyane?

Aguas SB simulator reference scenario for 950 p.e. of reported load: 43,972 kWh per year (59.3 kWh per p.e. of average load), with aeration as 58 % of consumption. Estimate with the country reference profile; not a measurement of the plant.

SOURCE AND CORRECTIONS

Source

reported data · European Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · data 2022 · edition 2023 · source licence: CC BY 4.0 · JSON for this plant · suggest a correction · catalogue 2026-11-06. Reported data, not a current inspection; no compliance judgements.