Worldwide wastewater treatment observatory · Norway

Aguas SB Observatory · public data to understand water

WWTP Elstrøm renseanlegg

Norway · official identifier NO4003.0106.01

24,500h-e design capacity (2022) · 58th of 340

European Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · official identifier NO4003.0106.01 · reported size 24,500 h-e design capacity · received load 21,607 h-e · reported treatment: PST · data year 2022. 58th of 340 records with reported size in the inventory of Norway; 0.32 % of the sum of those 340 records in h-e (sum of records, not national capacity); nearest inventoried plant at 7.3 km · 1 within 10 km. Reported data with their source; estimates are not measurements of the plant.

Aguas SB does not manage this wastewater treatment plant.

WHAT THE DATA REPORT

Reported data official data · 2022

24,500h-e design capacity
21,607h-e received load (2022)
88 %reported load/capacity ratio (not hydraulic utilisation)
58th of 340by reported size among the 340 records with a size in the inventory · 0.32 % of the sum of those records (sum of records, not national capacity) · the largest plants in the country · how it is calculated
Treatmentprimary + secondary + tertiary (more stringent) (as reported to the EEA: PST) · reported levels
Nitrogen removalnot reported
Phosphorus removalyes
UV disinfectionnot reported
Statusactive
Reported coordinates59.1997, 9.5881 precision reported by the source: level 2 what it means
Source and yearEuropean Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · dataset record

REGULATORY REFERENCES

Referencia normativa: Norway

Regulatory framework of Norway. Individual applicability is not determined in this profile.

SCENARIO

Reference energy scenario for this load estimate · simulator engine

819,428reference kWh per year for this load
48.6kWh per h-e (average load) per year
122,914€ per year at 0.15 €/kWh
46 %share of energy used for aeration

what this estimate is · Inputs: 21,607 p.e. of reported load; equivalent average load 16,852 p.e. with the reference profile of Norway (hypothesis with reported load and reference profile; not a measurement). Open this scenario in the simulator · how it is calculated and what it is not.

Reference scenario computed on the server from the reported load and the country profile; an estimate, not a measurement. The simulator recomputes it when opened.

WATER THAT COULD RETURN

Reuse potential

1.6estimated hm³ of treated water per year
tertiary treatment reporteda starting point for reclamation

what this estimate is · Volume estimated from the reported load (4,321 m³/day of reference), not measured or available for reclamation.

LOCATION

Norway: this plant on the map

this plant on the map · regional directory.

NEARBY PLANTS

Nearby wastewater treatment plants

PlantDistanceCapacity (h-e)Load 2022Treatment
Knarrdalstrand Renseanlegg7.3 km82,50042,041primary, secondary and tertiary
Heistad Renseanlegg14.6 km13,00011,723primary, secondary and tertiary
Søvitt Renseanlegg19.5 km6,0002,625primary, secondary and tertiary
Salen Renseanlegg22.0 km14,00013,548primary, secondary and tertiary
Prestestranda Renseanlegg31.7 km4,0001,631primary, secondary and tertiary

Distances are between reported coordinates; proximity does not establish a hydraulic connection.

QUESTIONS

Frequently asked questions about this plant

What capacity does WWTP Elstrøm renseanlegg report?

Reported size: 24,500 h-e design capacity. Received load: 21,607 h-e. Units are retained without conversion.

What treatment is reported?

Treatment PST. Nitrogen, phosphorus and UV are shown only when explicitly reported.

How much energy would a reference plant use with the load of Elstrøm renseanlegg?

Aguas SB simulator reference scenario for 21,607 p.e. of reported load: 819,428 kWh per year (48.6 kWh per p.e. of average load), with aeration as 46 % of consumption. Estimate with the country reference profile; not a measurement of the plant.

SOURCE AND CORRECTIONS

Source

reported data · European Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · data 2022 · edition 2023 · source licence: CC BY 4.0 · JSON for this plant · suggest a correction · catalogue 2026-11-06. Reported data, not a current inspection; no compliance judgements.