WWTP Garnes
Norway · official identifier NO4601.0334.01
15,000h-e design capacity (2022) · 83rd of 340 (tied with 3 others)
European Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · official identifier NO4601.0334.01 · reported size 15,000 h-e design capacity · received load 14,731 h-e · reported treatment: P · data year 2022. 83rd of 340 records with reported size in the inventory of Norway (tied with 3 others); 0.20 % of the sum of those 340 records in h-e (sum of records, not national capacity); nearest inventoried plant at 1.6 km · 3 within 10 km. Reported data with their source; estimates are not measurements of the plant.
Aguas SB does not manage this wastewater treatment plant.
WHAT THE DATA REPORT
Reported data official data · 2022
| Treatment | primario (as reported to the EEA: P) · reported levels |
|---|---|
| Nitrogen removal | not reported |
| Phosphorus removal | not reported |
| UV disinfection | not reported |
| Status | active |
| Reported coordinates | 60.4517, 5.4667 precision reported by the source: level 2 what it means |
| Source and year | European Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · dataset record |
REGULATORY REFERENCES
Referencia normativa: Norway
Regulatory framework of Norway. Individual applicability is not determined in this profile.
SCENARIO
Reference energy scenario for this load estimate · simulator engine
what this estimate is · Inputs: 14,731 p.e. of reported load; equivalent average load 11,489 p.e. with the reference profile of Norway (hypothesis with reported load and reference profile; not a measurement). Open this scenario in the simulator · how it is calculated and what it is not.
Reference scenario computed on the server from the reported load and the country profile; an estimate, not a measurement. The simulator recomputes it when opened.
WATER THAT COULD RETURN
Reuse potential
what this estimate is · Volume estimated from the reported load (2,946 m³/day of reference), not measured or available for reclamation.
NEARBY PLANTS
Nearby wastewater treatment plants
| Plant | Distance | Capacity (h-e) | Load 2022 | Treatment |
|---|---|---|---|---|
| Ytre Arna Renseanlegg | 1.6 km | 3,000 | 2,667 | not reported |
| Hagardsviken-Garnes | 1.6 km | 700 | 416 | primary |
| Ytre Sandviken Ra | 9.7 km | 44,000 | 75,825 | primary and secondary |
| Eikeviken | 10.0 km | 1,200 | 518 | primary |
| Hylkje | 10.2 km | 5,000 | 1,214 | not reported |
Distances are between reported coordinates; proximity does not establish a hydraulic connection.
QUESTIONS
Frequently asked questions about this plant
What capacity does WWTP Garnes report?
Reported size: 15,000 h-e design capacity. Received load: 14,731 h-e. Units are retained without conversion.
What treatment is reported?
Treatment P. Nitrogen, phosphorus and UV are shown only when explicitly reported.
How much energy would a reference plant use with the load of Garnes?
Aguas SB simulator reference scenario for 14,731 p.e. of reported load: 563,573 kWh per year (49.1 kWh per p.e. of average load), with aeration as 45 % of consumption. Estimate with the country reference profile; not a measurement of the plant.