Worldwide wastewater treatment observatory · Norway
Aguas SB Observatory · public data to understand water
WWTP Holen renseanlegg
Norway · official identifier NO4601.0344.01
134,000h-e design capacity (2022) · 13th of 340
European Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · official identifier NO4601.0344.01 · reported size 134,000 h-e design capacity · received load 163,085 h-e · reported treatment: PS · data year 2022. 13th of 340 records with reported size in the inventory of Norway; 1.8 % of the sum of those 340 records in h-e (sum of records, not national capacity); nearest inventoried plant at 2.6 km · 63 within 10 km. Reported data with their source; estimates are not measurements of the plant.
Aguas SB does not manage this wastewater treatment plant.
WHAT THE DATA REPORT
Reported data official data · 2022
| Treatment | primary + secondary (as reported to the EEA: PS) · reported levels |
|---|---|
| Nitrogen removal | not reported |
| Phosphorus removal | not reported |
| UV disinfection | not reported |
| Status | active |
| Reported coordinates | 60.3940, 5.2736 precision reported by the source: level 2 what it means |
| Source and year | European Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · dataset record |
FUENTES PÚBLICAS
What public sources report
Documented milestones
- 2015 · The Holen wastewater treatment plant in Bergen first entered service in 1997. The new facility was ready in 2015. Municipality of Bergen
Facts taken from public documents, with their date and link; an authorisation, a project or a planned capacity do not prove operation or quantities actually treated. Aguas SB editorial layer, lot L06; it does not change the official data.
REGULATORY REFERENCES
Referencia normativa: Norway
Regulatory framework of Norway. Individual applicability is not determined in this profile.
SCENARIO
Reference energy scenario for this load estimate · simulator engine
what this estimate is · Inputs: 163,085 p.e. of reported load; equivalent average load 127,206 p.e. with the reference profile of Norway (hypothesis with reported load and reference profile; not a measurement). Open this scenario in the simulator · how it is calculated and what it is not.
Reference scenario computed on the server from the reported load and the country profile; an estimate, not a measurement. The simulator recomputes it when opened.
WATER THAT COULD RETURN
Reuse potential
what this estimate is · Volume estimated from the reported load (32,617 m³/day of reference), not measured or available for reclamation.
NEARBY PLANTS
Nearby wastewater treatment plants
| Plant | Distance | Capacity (h-e) | Load 2022 | Treatment |
|---|---|---|---|---|
| Kjøkkelvik | 2.6 km | 3,000 | 1,526 | primary |
| Strand | 2.8 km | 300 | 118 | primary |
| Brøstaneset Renseanlegg | 2.8 km | 210 | 115 | primary and secondary |
| Gullskjærvik | 2.8 km | 200 | 115 | primary |
| Ekrene Florvåg | 2.8 km | 275 | 172 | primary |
Distances are between reported coordinates; proximity does not establish a hydraulic connection.
QUESTIONS
Frequently asked questions about this plant
What capacity does WWTP Holen renseanlegg report?
Reported size: 134,000 h-e design capacity. Received load: 163,085 h-e. Units are retained without conversion.
What treatment is reported?
Treatment PS. Nitrogen, phosphorus and UV are shown only when explicitly reported.
How much energy would a reference plant use with the load of Holen renseanlegg?
Aguas SB simulator reference scenario for 163,085 p.e. of reported load: 4,535,955 kWh per year (35.7 kWh per p.e. of average load), with aeration as 53 % of consumption. Estimate with the country reference profile; not a measurement of the plant.
SOURCE AND CORRECTIONS
Source
reported data · European Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · data 2022 · edition 2023 · source licence: CC BY 4.0 · JSON for this plant · suggest a correction · catalogue 2026-11-06. Reported data, not a current inspection; no compliance judgements.