Worldwide wastewater treatment observatory · Norway
Aguas SB Observatory · public data to understand water
WWTP Horsøy industriområde renseanlegg
Norway · official identifier NO4627.0143.03
300h-e design capacity (2022) · 280th of 340 (tied with 9 others)
European Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · official identifier NO4627.0143.03 · reported size 300 h-e design capacity · received load 200 h-e · reported treatment: PS · data year 2022. 280th of 340 records with reported size in the inventory of Norway (tied with 9 others); < 0.01 % of the sum of those 340 records in h-e (sum of records, not national capacity); nearest inventoried plant at 0.8 km · 71 within 10 km. Reported data with their source; estimates are not measurements of the plant.
Aguas SB does not manage this wastewater treatment plant.
WHAT THE DATA REPORT
Reported data official data · 2022
| Treatment | primary + secondary (as reported to the EEA: PS) · reported levels |
|---|---|
| Nitrogen removal | not reported |
| Phosphorus removal | not reported |
| UV disinfection | not reported |
| Status | active |
| Reported coordinates | 60.4302, 5.1610 precision reported by the source: level 2 what it means |
| Source and year | European Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · dataset record |
REGULATORY REFERENCES
Referencia normativa: Norway
Regulatory framework of Norway. Individual applicability is not determined in this profile.
SCENARIO
Reference energy scenario for this load estimate · simulator engine
what this estimate is · Inputs: 200 p.e. of reported load; equivalent average load 156 p.e. with the reference profile of Norway (hypothesis with reported load and reference profile; not a measurement). Open this scenario in the simulator · how it is calculated and what it is not.
Reference scenario computed on the server from the reported load and the country profile; an estimate, not a measurement. The simulator recomputes it when opened.
WATER THAT COULD RETURN
Reuse potential
what this estimate is · Volume estimated from the reported load (40 m³/day of reference), not measured or available for reclamation.
NEARBY PLANTS
Nearby wastewater treatment plants
| Plant | Distance | Capacity (h-e) | Load 2022 | Treatment |
|---|---|---|---|---|
| Juvik | 1.1 km | 2,500 | 2,246 | primary |
| Eide, Hetlevik | 1.2 km | 800 | 882 | primary |
| Lavik | 1.3 km | 120 | 106 | primary |
| Polleelva | 1.5 km | 1,500 | 105 | primary |
| Tømmervik (P) | 1.6 km | 120 | 63 | primary |
Distances are between reported coordinates; proximity does not establish a hydraulic connection.
QUESTIONS
Frequently asked questions about this plant
What capacity does WWTP Horsøy industriområde renseanlegg report?
Reported size: 300 h-e design capacity. Received load: 200 h-e. Units are retained without conversion.
What treatment is reported?
Treatment PS. Nitrogen, phosphorus and UV are shown only when explicitly reported.
How much energy would a reference plant use with the load of Horsøy industriområde renseanlegg?
Aguas SB simulator reference scenario for 200 p.e. of reported load: 15,960 kWh per year (102.3 kWh per p.e. of average load), with aeration as 44 % of consumption. Estimate with the country reference profile; not a measurement of the plant.
SOURCE AND CORRECTIONS
Source
reported data · European Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · data 2022 · edition 2023 · source licence: CC BY 4.0 · JSON for this plant · suggest a correction · catalogue 2026-11-06. Reported data, not a current inspection; no compliance judgements.