Worldwide wastewater treatment observatory · Norway
Aguas SB Observatory · public data to understand water
WWTP Kapp renseanlegg
Norway · official identifier NO3442.0015.01
6,200h-e design capacity (2022) · 149th of 340 (tied with 1 others)
European Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · official identifier NO3442.0015.01 · reported size 6,200 h-e design capacity · received load 2,919 h-e · reported treatment: PST · data year 2022. 149th of 340 records with reported size in the inventory of Norway (tied with 1 others); 0.08 % of the sum of those 340 records in h-e (sum of records, not national capacity); nearest inventoried plant at 5.7 km · 3 within 10 km. Reported data with their source; estimates are not measurements of the plant.
Aguas SB does not manage this wastewater treatment plant.
WHAT THE DATA REPORT
Reported data official data · 2022
| Treatment | primary + secondary + tertiary (more stringent) (as reported to the EEA: PST) · reported levels |
|---|---|
| Nitrogen removal | not reported |
| Phosphorus removal | yes |
| UV disinfection | not reported |
| Status | active |
| Reported coordinates | 60.7168, 10.8598 precision reported by the source: level 2 what it means |
| Source and year | European Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · dataset record |
REGULATORY REFERENCES
Referencia normativa: Norway
Regulatory framework of Norway. Individual applicability is not determined in this profile.
SCENARIO
Reference energy scenario for this load estimate · simulator engine
what this estimate is · Inputs: 2,919 p.e. of reported load; equivalent average load 2,278 p.e. with the reference profile of Norway (hypothesis with reported load and reference profile; not a measurement). Open this scenario in the simulator · how it is calculated and what it is not.
Reference scenario computed on the server from the reported load and the country profile; an estimate, not a measurement. The simulator recomputes it when opened.
WATER THAT COULD RETURN
Reuse potential
what this estimate is · Volume estimated from the reported load (584 m³/day of reference), not measured or available for reclamation.
NEARBY PLANTS
Nearby wastewater treatment plants
| Plant | Distance | Capacity (h-e) | Load 2022 | Treatment |
|---|---|---|---|---|
| Lena Renseanlegg | 5.7 km | 4,150 | 3,308 | primary, secondary and tertiary |
| Nes Renseanlegg | 6.1 km | 5,000 | 2,277 | primary, secondary and tertiary |
| Skreia Renseanlegg | 8.7 km | 12,800 | 13,344 | primary, secondary and tertiary |
| Rambekk Renseanlegg | 10.7 km | 45,000 | 43,174 | primary, secondary and tertiary |
| Hias Renseanlegg | 13.1 km | 165,000 | 155,745 | primary, secondary and tertiary |
Distances are between reported coordinates; proximity does not establish a hydraulic connection.
QUESTIONS
Frequently asked questions about this plant
What capacity does WWTP Kapp renseanlegg report?
Reported size: 6,200 h-e design capacity. Received load: 2,919 h-e. Units are retained without conversion.
What treatment is reported?
Treatment PST. Nitrogen, phosphorus and UV are shown only when explicitly reported.
How much energy would a reference plant use with the load of Kapp renseanlegg?
Aguas SB simulator reference scenario for 2,919 p.e. of reported load: 118,294 kWh per year (51.9 kWh per p.e. of average load), with aeration as 67 % of consumption. Estimate with the country reference profile; not a measurement of the plant.
SOURCE AND CORRECTIONS
Source
reported data · European Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · data 2022 · edition 2023 · source licence: CC BY 4.0 · JSON for this plant · suggest a correction · catalogue 2026-11-06. Reported data, not a current inspection; no compliance judgements.