Worldwide wastewater treatment observatory · Norway

Aguas SB Observatory · public data to understand water

WWTP Knappen renseanlegg

Norway · official identifier NO4601.0337.01

63,000h-e design capacity (2022) · 21st of 340 (tied with 1 others)

European Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · official identifier NO4601.0337.01 · reported size 63,000 h-e design capacity · received load 74,149 h-e · reported treatment: PST · data year 2022. 21st of 340 records with reported size in the inventory of Norway (tied with 1 others); 0.84 % of the sum of those 340 records in h-e (sum of records, not national capacity); nearest inventoried plant at 2.3 km · 32 within 10 km. Reported data with their source; estimates are not measurements of the plant.

Aguas SB does not manage this wastewater treatment plant.

WHAT THE DATA REPORT

Reported data official data · 2022

63,000h-e design capacity
74,149h-e received load (2022)
118 %reported load/capacity ratio (not hydraulic utilisation)
21st of 340by reported size among the 340 records with a size in the inventory (tied with 1 others) · 0.84 % of the sum of those records (sum of records, not national capacity) · the largest plants in the country · how it is calculated
Treatmentprimary + secondary + tertiary (more stringent) (as reported to the EEA: PST) · reported levels
Nitrogen removalnot reported
Phosphorus removalyes
UV disinfectionnot reported
Statusactive
Reported coordinates60.3298, 5.2528 precision reported by the source: level 2 what it means
Source and yearEuropean Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · dataset record

REGULATORY REFERENCES

Referencia normativa: Norway

Regulatory framework of Norway. Individual applicability is not determined in this profile.

SCENARIO

Reference energy scenario for this load estimate · simulator engine

2,421,093reference kWh per year for this load
41.9kWh per h-e (average load) per year
363,164€ per year at 0.15 €/kWh
52 %share of energy used for aeration

what this estimate is · Inputs: 74,149 p.e. of reported load; equivalent average load 57,837 p.e. with the reference profile of Norway (hypothesis with reported load and reference profile; not a measurement). Open this scenario in the simulator · how it is calculated and what it is not.

Reference scenario computed on the server from the reported load and the country profile; an estimate, not a measurement. The simulator recomputes it when opened.

WATER THAT COULD RETURN

Reuse potential

5.4estimated hm³ of treated water per year
tertiary treatment reporteda starting point for reclamation

what this estimate is · Volume estimated from the reported load (14,830 m³/day of reference), not measured or available for reclamation.

LOCATION

Norway: this plant on the map

this plant on the map · regional directory.

NEARBY PLANTS

Nearby wastewater treatment plants

PlantDistanceCapacity (h-e)Load 2022Treatment
Skareveien2.3 km125168primary
Skarehaugane2.9 km190127primary
Håkonshella4.2 km1401,091primary
Alvøen4.5 km11195primary
Flesland Renseanlegg5.7 km152,000234,490primary and secondary

Distances are between reported coordinates; proximity does not establish a hydraulic connection.

QUESTIONS

Frequently asked questions about this plant

What capacity does WWTP Knappen renseanlegg report?

Reported size: 63,000 h-e design capacity. Received load: 74,149 h-e. Units are retained without conversion.

What treatment is reported?

Treatment PST. Nitrogen, phosphorus and UV are shown only when explicitly reported.

How much energy would a reference plant use with the load of Knappen renseanlegg?

Aguas SB simulator reference scenario for 74,149 p.e. of reported load: 2,421,093 kWh per year (41.9 kWh per p.e. of average load), with aeration as 52 % of consumption. Estimate with the country reference profile; not a measurement of the plant.

SOURCE AND CORRECTIONS

Source

reported data · European Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · data 2022 · edition 2023 · source licence: CC BY 4.0 · JSON for this plant · suggest a correction · catalogue 2026-11-06. Reported data, not a current inspection; no compliance judgements.