Worldwide wastewater treatment observatory · Norway
Aguas SB Observatory · public data to understand water
WWTP Linnes avløpsanlegg
Norway · official identifier NO3312.0091.01
26,500h-e design capacity (2022) · 52nd of 340
European Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · official identifier NO3312.0091.01 · reported size 26,500 h-e design capacity · received load 38,462 h-e · reported treatment: PST · data year 2022. 52nd of 340 records with reported size in the inventory of Norway; 0.35 % of the sum of those 340 records in h-e (sum of records, not national capacity); nearest inventoried plant at 3.2 km · 3 within 10 km. Reported data with their source; estimates are not measurements of the plant.
Aguas SB does not manage this wastewater treatment plant.
WHAT THE DATA REPORT
Reported data official data · 2022
| Treatment | primary + secondary + tertiary (more stringent) (as reported to the EEA: PST) · reported levels |
|---|---|
| Nitrogen removal | not reported |
| Phosphorus removal | yes |
| UV disinfection | not reported |
| Status | active |
| Reported coordinates | 59.7498, 10.2884 precision reported by the source: level 2 what it means |
| Source and year | European Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · dataset record |
REGULATORY REFERENCES
Referencia normativa: Norway
Regulatory framework of Norway. Individual applicability is not determined in this profile.
SCENARIO
Reference energy scenario for this load estimate · simulator engine
what this estimate is · Inputs: 38,462 p.e. of reported load; equivalent average load 29,999 p.e. with the reference profile of Norway (hypothesis with reported load and reference profile; not a measurement). Open this scenario in the simulator · how it is calculated and what it is not.
Reference scenario computed on the server from the reported load and the country profile; an estimate, not a measurement. The simulator recomputes it when opened.
WATER THAT COULD RETURN
Reuse potential
what this estimate is · Volume estimated from the reported load (7,692 m³/day of reference), not measured or available for reclamation.
NEARBY PLANTS
Nearby wastewater treatment plants
| Plant | Distance | Capacity (h-e) | Load 2022 | Treatment |
|---|---|---|---|---|
| Lahell Avløpsanlegg | 3.2 km | 5,000 | 5,100 | primary, secondary and tertiary |
| Solumstrand Avløpsanlegg | 4.4 km | 130,000 | 108,681 | primary, secondary and tertiary |
| Muusøya Avløpsanlegg | 7.6 km | 22,000 | 23,233 | primary, secondary and tertiary |
| Sentralrenseanlegg Vest (Veas) | 12.8 km | 1,100,000 | 707,000 | primary, secondary and tertiary |
| Mjøndalen Avløpsanlegg | 14.6 km | 25,000 | 58,709 | primary, secondary and tertiary |
Distances are between reported coordinates; proximity does not establish a hydraulic connection.
QUESTIONS
Frequently asked questions about this plant
What capacity does WWTP Linnes avløpsanlegg report?
Reported size: 26,500 h-e design capacity. Received load: 38,462 h-e. Units are retained without conversion.
What treatment is reported?
Treatment PST. Nitrogen, phosphorus and UV are shown only when explicitly reported.
How much energy would a reference plant use with the load of Linnes avløpsanlegg?
Aguas SB simulator reference scenario for 38,462 p.e. of reported load: 1,434,240 kWh per year (47.8 kWh per p.e. of average load), with aeration as 51 % of consumption. Estimate with the country reference profile; not a measurement of the plant.
SOURCE AND CORRECTIONS
Source
reported data · European Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · data 2022 · edition 2023 · source licence: CC BY 4.0 · JSON for this plant · suggest a correction · catalogue 2026-11-06. Reported data, not a current inspection; no compliance judgements.