Worldwide wastewater treatment observatory · Norway
Aguas SB Observatory · public data to understand water
WWTP Mørkvedodden renseanlegg
Norway · official identifier NO1804.0088.01
12,000h-e design capacity (2022) · 100th of 340 (tied with 5 others)
European Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · official identifier NO1804.0088.01 · reported size 12,000 h-e design capacity · received load 11,417 h-e · reported treatment: P · data year 2022. 100th of 340 records with reported size in the inventory of Norway (tied with 5 others); 0.16 % of the sum of those 340 records in h-e (sum of records, not national capacity); nearest inventoried plant at 2.2 km · 9 within 10 km. Reported data with their source; estimates are not measurements of the plant.
Aguas SB does not manage this wastewater treatment plant.
WHAT THE DATA REPORT
Reported data official data · 2022
| Treatment | primario (as reported to the EEA: P) · reported levels |
|---|---|
| Nitrogen removal | not reported |
| Phosphorus removal | not reported |
| UV disinfection | not reported |
| Status | active |
| Reported coordinates | 67.2770, 14.5670 precision reported by the source: level 2 what it means |
| Source and year | European Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · dataset record |
REGULATORY REFERENCES
Referencia normativa: Norway
Regulatory framework of Norway. Individual applicability is not determined in this profile.
SCENARIO
Reference energy scenario for this load estimate · simulator engine
what this estimate is · Inputs: 11,417 p.e. of reported load; equivalent average load 8,904 p.e. with the reference profile of Norway (hypothesis with reported load and reference profile; not a measurement). Open this scenario in the simulator · how it is calculated and what it is not.
Reference scenario computed on the server from the reported load and the country profile; an estimate, not a measurement. The simulator recomputes it when opened.
WATER THAT COULD RETURN
Reuse potential
what this estimate is · Volume estimated from the reported load (2,283 m³/day of reference), not measured or available for reclamation.
NEARBY PLANTS
Nearby wastewater treatment plants
| Plant | Distance | Capacity (h-e) | Load 2022 | Treatment |
|---|---|---|---|---|
| Stokkvika Renseanlegg | 3.2 km | 9,150 | 3,004 | not reported |
| Alstad Avløpsanlegg | 3.8 km | 780 | 760 | primary |
| Jensvoll Renseanlegg | 4.5 km | 9,000 | 5,242 | primary |
| Bodøsjøen II | 5.1 km | 600 | 1,096 | not reported |
| Skansenodden Renseanlegg | 6.4 km | 12,000 | 5,666 | primary |
Distances are between reported coordinates; proximity does not establish a hydraulic connection.
QUESTIONS
Frequently asked questions about this plant
What capacity does WWTP Mørkvedodden renseanlegg report?
Reported size: 12,000 h-e design capacity. Received load: 11,417 h-e. Units are retained without conversion.
What treatment is reported?
Treatment P. Nitrogen, phosphorus and UV are shown only when explicitly reported.
How much energy would a reference plant use with the load of Mørkvedodden renseanlegg?
Aguas SB simulator reference scenario for 11,417 p.e. of reported load: 441,165 kWh per year (49.5 kWh per p.e. of average load), with aeration as 45 % of consumption. Estimate with the country reference profile; not a measurement of the plant.
SOURCE AND CORRECTIONS
Source
reported data · European Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · data 2022 · edition 2023 · source licence: CC BY 4.0 · JSON for this plant · suggest a correction · catalogue 2026-11-06. Reported data, not a current inspection; no compliance judgements.