Worldwide wastewater treatment observatory · Norway

Aguas SB Observatory · public data to understand water

WWTP Nye Notaneset renseanlegg

Norway · official identifier NO4622.0082.01

16,400h-e design capacity (2022) · 78th of 340 (tied with 1 others)

European Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · official identifier NO4622.0082.01 · reported size 16,400 h-e design capacity · received load 4,033 h-e · reported treatment: P · data year 2022. 78th of 340 records with reported size in the inventory of Norway (tied with 1 others); 0.22 % of the sum of those 340 records in h-e (sum of records, not national capacity). Reported data with their source; estimates are not measurements of the plant.

Aguas SB does not manage this wastewater treatment plant.

Aerial image withheld. The reported coordinate matches another facility or is missing: the location awaits cross-checking. The table retains the reported data.

WHAT THE DATA REPORT

Reported data official data · 2022

16,400h-e design capacity
4,033h-e received load (2022)
25 %reported load/capacity ratio (not hydraulic utilisation)
78th of 340by reported size among the 340 records with a size in the inventory (tied with 1 others) · 0.22 % of the sum of those records (sum of records, not national capacity) · the largest plants in the country · how it is calculated
Treatmentprimario (as reported to the EEA: P) · reported levels
Nitrogen removalnot reported
Phosphorus removalnot reported
UV disinfectionnot reported
Statusactive
Reported coordinates60.3819, 6.2001 approximate position · location awaiting cross-checking
Source and yearEuropean Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · dataset record

REGULATORY REFERENCES

Referencia normativa: Norway

Regulatory framework of Norway. Individual applicability is not determined in this profile.

SCENARIO

Reference energy scenario for this load estimate · simulator engine

159,382reference kWh per year for this load
50.6kWh per h-e (average load) per year
23,907€ per year at 0.15 €/kWh
68 %share of energy used for aeration

what this estimate is · Inputs: 4,033 p.e. of reported load; equivalent average load 3,147 p.e. with the reference profile of Norway (hypothesis with reported load and reference profile; not a measurement). Open this scenario in the simulator · how it is calculated and what it is not.

Reference scenario computed on the server from the reported load and the country profile; an estimate, not a measurement. The simulator recomputes it when opened.

WATER THAT COULD RETURN

Reuse potential

0.3estimated hm³ of treated water per year
tertiary treatment not reportedreclamation requires additional treatment

what this estimate is · Volume estimated from the reported load (807 m³/day of reference), not measured or available for reclamation.

LOCATION

Norway: this plant on the map

this plant on the map · regional directory.

NEARBY PLANTS

Nearby wastewater treatment plants

Nearby plants are not shown: this plant's location awaits cross-checking.

QUESTIONS

Frequently asked questions about this plant

What capacity does WWTP Nye Notaneset renseanlegg report?

Reported size: 16,400 h-e design capacity. Received load: 4,033 h-e. Units are retained without conversion.

What treatment is reported?

Treatment P. Nitrogen, phosphorus and UV are shown only when explicitly reported.

How much energy would a reference plant use with the load of Nye Notaneset renseanlegg?

Aguas SB simulator reference scenario for 4,033 p.e. of reported load: 159,382 kWh per year (50.6 kWh per p.e. of average load), with aeration as 68 % of consumption. Estimate with the country reference profile; not a measurement of the plant.

SOURCE AND CORRECTIONS

Source

reported data · European Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · data 2022 · edition 2023 · source licence: CC BY 4.0 · JSON for this plant · suggest a correction · catalogue 2026-11-06. Reported data, not a current inspection; no compliance judgements.