Worldwide wastewater treatment observatory · Norway
Aguas SB Observatory · public data to understand water
WWTP Odderøya renseanlegg
Norway · official identifier NO4204.0222.01
200,000h-e design capacity (2022) · 5th of 340
European Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · official identifier NO4204.0222.01 · reported size 200,000 h-e design capacity · received load 87,234 h-e · reported treatment: PST · data year 2022. 5th of 340 records with reported size in the inventory of Norway; 2.7 % of the sum of those 340 records in h-e (sum of records, not national capacity); nearest inventoried plant at 2.7 km · 1 within 10 km. Reported data with their source; estimates are not measurements of the plant.
Aguas SB does not manage this wastewater treatment plant.
WHAT THE DATA REPORT
Reported data official data · 2022
| Treatment | primary + secondary + tertiary (more stringent) (as reported to the EEA: PST) · reported levels |
|---|---|
| Nitrogen removal | not reported |
| Phosphorus removal | yes |
| UV disinfection | not reported |
| Status | active |
| Reported coordinates | 58.1335, 7.9993 precision reported by the source: level 2 what it means |
| Source and year | European Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · dataset record |
FUENTES PÚBLICAS
What public sources report
Documented milestones
- 2021 · The Odderøya biogas unit returned to service in 2021 after refurbishment. It mainly treats sludge from the Odderøya wastewater treatment plant. County Governor of Agder
Other published data
| Mean annual volume treated reported in the 2022 cycle | 7,696,087 m³/year (2022) · source |
|---|
Facts taken from public documents, with their date and link; an authorisation, a project or a planned capacity do not prove operation or quantities actually treated. Aguas SB editorial layer, lot L04; it does not change the official data.
REGULATORY REFERENCES
Referencia normativa: Norway
Regulatory framework of Norway. Individual applicability is not determined in this profile.
SCENARIO
Reference energy scenario for this load estimate · simulator engine
what this estimate is · Inputs: 87,234 p.e. of reported load; equivalent average load 68,043 p.e. with the reference profile of Norway (hypothesis with reported load and reference profile; not a measurement). Open this scenario in the simulator · how it is calculated and what it is not.
Reference scenario computed on the server from the reported load and the country profile; an estimate, not a measurement. The simulator recomputes it when opened.
WATER THAT COULD RETURN
Reuse potential
what this estimate is · Volume estimated from the reported load (17,447 m³/day of reference), not measured or available for reclamation.
NEARBY PLANTS
Nearby wastewater treatment plants
| Plant | Distance | Capacity (h-e) | Load 2022 | Treatment |
|---|---|---|---|---|
| Bredalsholmen Renseanlegg | 2.7 km | 35,000 | 78,167 | primary, secondary and tertiary |
| Høllen Renseanlegg | 12.8 km | 16,000 | 16,823 | primary, secondary and tertiary |
| Fossbekk Renseanlegg | 24.9 km | 14,000 | 20,828 | primary, secondary and tertiary |
| Birkeland Renseanlegg | 25.6 km | 4,000 | 3,179 | primary, secondary and tertiary |
| Grønvika Renseanlegg - Mandal | 33.9 km | 21,000 | 14,533 | primary, secondary and tertiary |
Distances are between reported coordinates; proximity does not establish a hydraulic connection.
QUESTIONS
Frequently asked questions about this plant
What capacity does WWTP Odderøya renseanlegg report?
Reported size: 200,000 h-e design capacity. Received load: 87,234 h-e. Units are retained without conversion.
What treatment is reported?
Treatment PST. Nitrogen, phosphorus and UV are shown only when explicitly reported.
How much energy would a reference plant use with the load of Odderøya renseanlegg?
Aguas SB simulator reference scenario for 87,234 p.e. of reported load: 2,756,703 kWh per year (40.5 kWh per p.e. of average load), with aeration as 52 % of consumption. Estimate with the country reference profile; not a measurement of the plant.
SOURCE AND CORRECTIONS
Source
reported data · European Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · data 2022 · edition 2023 · source licence: CC BY 4.0 · JSON for this plant · suggest a correction · catalogue 2026-11-06. Reported data, not a current inspection; no compliance judgements.