Worldwide wastewater treatment observatory · Norway
Aguas SB Observatory · public data to understand water
WWTP RA26 Hankane
Norway · official identifier NO1508.0254.01
250h-e design capacity (2022) · 293rd of 340 (tied with 3 others)
European Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · official identifier NO1508.0254.01 · reported size 250 h-e design capacity · received load 92 h-e · reported treatment: PS · data year 2022. 293rd of 340 records with reported size in the inventory of Norway (tied with 3 others); < 0.01 % of the sum of those 340 records in h-e (sum of records, not national capacity); nearest inventoried plant at 3.2 km · 14 within 10 km. Reported data with their source; estimates are not measurements of the plant.
Aguas SB does not manage this wastewater treatment plant.
WHAT THE DATA REPORT
Reported data official data · 2022
| Treatment | primary + secondary (as reported to the EEA: PS) · reported levels |
|---|---|
| Nitrogen removal | not reported |
| Phosphorus removal | not reported |
| UV disinfection | not reported |
| Status | active |
| Reported coordinates | 62.4330, 6.3219 precision reported by the source: level 2 what it means |
| Source and year | European Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · dataset record |
REGULATORY REFERENCES
Referencia normativa: Norway
Regulatory framework of Norway. Individual applicability is not determined in this profile.
SCENARIO
Reference energy scenario for this load estimate · simulator engine
what this estimate is · Inputs: 92 p.e. of reported load; equivalent average load 70 p.e. with the reference profile of Norway (hypothesis with reported load and reference profile; not a measurement). Open this scenario in the simulator · how it is calculated and what it is not.
Reference scenario computed on the server from the reported load and the country profile; an estimate, not a measurement. The simulator recomputes it when opened.
WATER THAT COULD RETURN
Reuse potential
what this estimate is · Volume estimated from the reported load (18 m³/day of reference), not measured or available for reclamation.
NEARBY PLANTS
Nearby wastewater treatment plants
| Plant | Distance | Capacity (h-e) | Load 2022 | Treatment |
|---|---|---|---|---|
| Ra4 Åse | 3.2 km | 25,000 | 14,190 | primary |
| Ra2 Djupvika | 3.3 km | 3,000 | 2,668 | primary |
| U85 Bogneset | 4.2 km | 28 | 17 | not reported |
| Ra6 Flisnes | 4.4 km | 16,500 | 10,015 | primary |
| Ra5 Breivika | 4.7 km | 7,000 | 6,140 | primary |
Distances are between reported coordinates; proximity does not establish a hydraulic connection.
QUESTIONS
Frequently asked questions about this plant
What capacity does WWTP RA26 Hankane report?
Reported size: 250 h-e design capacity. Received load: 92 h-e. Units are retained without conversion.
What treatment is reported?
Treatment PS. Nitrogen, phosphorus and UV are shown only when explicitly reported.
How much energy would a reference plant use with the load of RA26 Hankane?
Aguas SB simulator reference scenario for 92 p.e. of reported load: 8,978 kWh per year (127.9 kWh per p.e. of average load), with aeration as 35 % of consumption. Estimate with the country reference profile; not a measurement of the plant.
SOURCE AND CORRECTIONS
Source
reported data · European Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · data 2022 · edition 2023 · source licence: CC BY 4.0 · JSON for this plant · suggest a correction · catalogue 2026-11-06. Reported data, not a current inspection; no compliance judgements.