Worldwide wastewater treatment observatory · Norway

Aguas SB Observatory · public data to understand water

WWTP Røn renseanlegg

Norway · official identifier NO3452.0005.01

2,100h-e design capacity (2022) · 226th of 340 (tied with 1 others)

European Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · official identifier NO3452.0005.01 · reported size 2,100 h-e design capacity · received load 1,053 h-e · reported treatment: PST · data year 2022. 226th of 340 records with reported size in the inventory of Norway (tied with 1 others); 0.03 % of the sum of those 340 records in h-e (sum of records, not national capacity); nearest inventoried plant at 3.9 km · 1 within 10 km. Reported data with their source; estimates are not measurements of the plant.

Aguas SB does not manage this wastewater treatment plant.

WHAT THE DATA REPORT

Reported data official data · 2022

2,100h-e design capacity
1,053h-e received load (2022)
50 %reported load/capacity ratio (not hydraulic utilisation)
226th of 340by reported size among the 340 records with a size in the inventory (tied with 1 others) · 0.03 % of the sum of those records (sum of records, not national capacity) · the largest plants in the country · how it is calculated
Treatmentprimary + secondary + tertiary (more stringent) (as reported to the EEA: PST) · reported levels
Nitrogen removalnot reported
Phosphorus removalyes
UV disinfectionnot reported
Statusactive
Reported coordinates61.0319, 9.0536 precision reported by the source: level 2 what it means
Source and yearEuropean Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · dataset record

REGULATORY REFERENCES

Referencia normativa: Norway

Regulatory framework of Norway. Individual applicability is not determined in this profile.

SCENARIO

Reference energy scenario for this load estimate · simulator engine

47,711reference kWh per year for this load
58.0kWh per h-e (average load) per year
7,157€ per year at 0.15 €/kWh
60 %share of energy used for aeration

what this estimate is · Inputs: 1,053 p.e. of reported load; equivalent average load 823 p.e. with the reference profile of Norway (hypothesis with reported load and reference profile; not a measurement). Open this scenario in the simulator · how it is calculated and what it is not.

Reference scenario computed on the server from the reported load and the country profile; an estimate, not a measurement. The simulator recomputes it when opened.

WATER THAT COULD RETURN

Reuse potential

0.1estimated hm³ of treated water per year
tertiary treatment reporteda starting point for reclamation

what this estimate is · Volume estimated from the reported load (211 m³/day of reference), not measured or available for reclamation.

LOCATION

Norway: this plant on the map

this plant on the map · regional directory.

NEARBY PLANTS

Nearby wastewater treatment plants

PlantDistanceCapacity (h-e)Load 2022Treatment
Vaset Renseanlegg3.9 km2,6001,571primary, secondary and tertiary
Fagernes-Leira Renseanlegg16.0 km7,5004,103primary, secondary and tertiary
Golsfjellet Avløpsanlegg22.0 km5,1002,580primary, secondary and tertiary
Aurdal Renseanlegg22.7 km6,0002,234primary, secondary and tertiary
Beito Renseanlegg24.1 km3,0004,617primary, secondary and tertiary

Distances are between reported coordinates; proximity does not establish a hydraulic connection.

QUESTIONS

Frequently asked questions about this plant

What capacity does WWTP Røn renseanlegg report?

Reported size: 2,100 h-e design capacity. Received load: 1,053 h-e. Units are retained without conversion.

What treatment is reported?

Treatment PST. Nitrogen, phosphorus and UV are shown only when explicitly reported.

How much energy would a reference plant use with the load of Røn renseanlegg?

Aguas SB simulator reference scenario for 1,053 p.e. of reported load: 47,711 kWh per year (58.0 kWh per p.e. of average load), with aeration as 60 % of consumption. Estimate with the country reference profile; not a measurement of the plant.

SOURCE AND CORRECTIONS

Source

reported data · European Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · data 2022 · edition 2023 · source licence: CC BY 4.0 · JSON for this plant · suggest a correction · catalogue 2026-11-06. Reported data, not a current inspection; no compliance judgements.