Worldwide wastewater treatment observatory · Norway

Aguas SB Observatory · public data to understand water

WWTP Sentralrenseanlegget for Nord Jæren SNJ

Norway · official identifier NO1127.0012.01

500,000h-e design capacity (2022) · 3rd of 340

European Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · official identifier NO1127.0012.01 · reported size 500,000 h-e design capacity · received load 454,000 h-e · reported treatment: PS · data year 2022. 3rd of 340 records with reported size in the inventory of Norway; 6.6 % of the sum of those 340 records in h-e (sum of records, not national capacity); nearest inventoried plant at 8.9 km · 1 within 10 km. Reported data with their source; estimates are not measurements of the plant.

Aguas SB does not manage this wastewater treatment plant.

WHAT THE DATA REPORT

Reported data official data · 2022

500,000h-e design capacity
454,000h-e received load (2022)
91 %reported load/capacity ratio (not hydraulic utilisation)
3rd of 340by reported size among the 340 records with a size in the inventory · 6.6 % of the sum of those records (sum of records, not national capacity) · the largest plants in the country · how it is calculated
Treatmentprimary + secondary (as reported to the EEA: PS) · reported levels
Nitrogen removalnot reported
Phosphorus removalnot reported
UV disinfectionnot reported
Statusactive
Reported coordinates59.0198, 5.6185 precision reported by the source: level 2 what it means
Source and yearEuropean Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · dataset record

FUENTES PÚBLICAS

What public sources report

Documented milestones

  • 2018 · The first phase of the biological treatment expansion at the Nord-Jæren central wastewater treatment plant entered service. City of Stavanger

Other published data

Mean annual volume treated reported in the 2022 cycle38,742,096 m³/year (2022) · source

Facts taken from public documents, with their date and link; an authorisation, a project or a planned capacity do not prove operation or quantities actually treated. Aguas SB editorial layer, lot L02; it does not change the official data.

REGULATORY REFERENCES

Referencia normativa: Norway

Regulatory framework of Norway. Individual applicability is not determined in this profile.

SCENARIO

Reference energy scenario for this load estimate · simulator engine

11,257,560reference kWh per year for this load
31.8kWh per h-e (average load) per year
1,688,634€ per year at 0.15 €/kWh
59 %share of energy used for aeration

what this estimate is · Inputs: 454,000 p.e. of reported load; equivalent average load 354,120 p.e. with the reference profile of Norway (hypothesis with reported load and reference profile; not a measurement). Open this scenario in the simulator · how it is calculated and what it is not.

Reference scenario computed on the server from the reported load and the country profile; an estimate, not a measurement. The simulator recomputes it when opened.

WATER THAT COULD RETURN

Reuse potential

33.1estimated hm³ of treated water per year
tertiary treatment not reportedreclamation requires additional treatment

what this estimate is · Volume estimated from the reported load (90,800 m³/day of reference), not measured or available for reclamation.

LOCATION

Norway: this plant on the map

this plant on the map · regional directory.

NEARBY PLANTS

Nearby wastewater treatment plants

PlantDistanceCapacity (h-e)Load 2022Treatment
Bore Renseanlegg25.4 km30,00029,000primary
Vik Renseanlegg34.5 km80,000152,437primary and secondary
Nærbø Renseanlegg39.7 km30,00030,900primary
Grødaland Renseanlegg43.2 km150,000176,000primary and secondary
Årabrot Avløpsanlegg51.6 km62,35036,658primary

Distances are between reported coordinates; proximity does not establish a hydraulic connection.

QUESTIONS

Frequently asked questions about this plant

What capacity does WWTP Sentralrenseanlegget for Nord Jæren SNJ report?

Reported size: 500,000 h-e design capacity. Received load: 454,000 h-e. Units are retained without conversion.

What treatment is reported?

Treatment PS. Nitrogen, phosphorus and UV are shown only when explicitly reported.

How much energy would a reference plant use with the load of Sentralrenseanlegget for Nord Jæren SNJ?

Aguas SB simulator reference scenario for 454,000 p.e. of reported load: 11,257,560 kWh per year (31.8 kWh per p.e. of average load), with aeration as 59 % of consumption. Estimate with the country reference profile; not a measurement of the plant.

SOURCE AND CORRECTIONS

Source

reported data · European Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · data 2022 · edition 2023 · source licence: CC BY 4.0 · JSON for this plant · suggest a correction · catalogue 2026-11-06. Reported data, not a current inspection; no compliance judgements.