Worldwide wastewater treatment observatory · Norway

Aguas SB Observatory · public data to understand water

WWTP Sølvseter 2 renseanlegg

Norway · official identifier NO3334.0028.01

60h-e design capacity (2022) · 333rd of 340

European Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · official identifier NO3334.0028.01 · reported size 60 h-e design capacity · received load 1 h-e · reported treatment: PST · data year 2022. 333rd of 340 records with reported size in the inventory of Norway; < 0.01 % of the sum of those 340 records in h-e (sum of records, not national capacity); nearest inventoried plant at 1.7 km · 9 within 10 km. Reported data with their source; estimates are not measurements of the plant.

Aguas SB does not manage this wastewater treatment plant.

WHAT THE DATA REPORT

Reported data official data · 2022

60h-e design capacity
1h-e received load (2022)
2 %reported load/capacity ratio (not hydraulic utilisation)
333rd of 340by reported size among the 340 records with a size in the inventory · < 0.01 % of the sum of those records (sum of records, not national capacity) · the largest plants in the country · how it is calculated
Treatmentprimary + secondary + tertiary (more stringent) (as reported to the EEA: PST) · reported levels
Nitrogen removalnot reported
Phosphorus removalyes
UV disinfectionnot reported
Statusactive
Reported coordinates59.7508, 9.4820 precision reported by the source: level 2 what it means
Source and yearEuropean Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · dataset record

REGULATORY REFERENCES

Referencia normativa: Norway

Regulatory framework of Norway. Individual applicability is not determined in this profile.

LOCATION

Norway: this plant on the map

this plant on the map · regional directory.

NEARBY PLANTS

Nearby wastewater treatment plants

PlantDistanceCapacity (h-e)Load 2022Treatment
Nipeto Renseanlegg1.7 km280280primary, secondary and tertiary
Ble Fjellskog Avløpsrenseanlegg2.1 km1,500575primary, secondary and tertiary
Rava Ble sa4.0 km348135primary, secondary and tertiary
Ådalen Avløpsanlegg6.5 km2,000836primary, secondary and tertiary
Sjuvasslia Feriesenters Vann Og Kloakk7.5 km149149not reported

Distances are between reported coordinates; proximity does not establish a hydraulic connection.

QUESTIONS

Frequently asked questions about this plant

What capacity does WWTP Sølvseter 2 renseanlegg report?

Reported size: 60 h-e design capacity. Received load: 1 h-e. Units are retained without conversion.

What treatment is reported?

Treatment PST. Nitrogen, phosphorus and UV are shown only when explicitly reported.

SOURCE AND CORRECTIONS

Source

reported data · European Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · data 2022 · edition 2023 · source licence: CC BY 4.0 · JSON for this plant · suggest a correction · catalogue 2026-11-06. Reported data, not a current inspection; no compliance judgements.