Worldwide wastewater treatment observatory · Norway
Aguas SB Observatory · public data to understand water
WWTP Storanipa hovudreinseanlegg
Norway · official identifier NO4626.0115.01
44,000h-e design capacity (2022) · 31st of 340 (tied with 1 others)
European Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · official identifier NO4626.0115.01 · reported size 44,000 h-e design capacity · received load 17,034 h-e · reported treatment: P · data year 2022. 31st of 340 records with reported size in the inventory of Norway (tied with 1 others); 0.58 % of the sum of those 340 records in h-e (sum of records, not national capacity); nearest inventoried plant at 0.2 km · 54 within 10 km. Reported data with their source; estimates are not measurements of the plant.
Aguas SB does not manage this wastewater treatment plant.
WHAT THE DATA REPORT
Reported data official data · 2022
| Treatment | primario (as reported to the EEA: P) · reported levels |
|---|---|
| Nitrogen removal | not reported |
| Phosphorus removal | not reported |
| UV disinfection | not reported |
| Status | active |
| Reported coordinates | 60.3859, 5.1240 precision reported by the source: level 2 what it means |
| Source and year | European Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · dataset record |
REGULATORY REFERENCES
Referencia normativa: Norway
Regulatory framework of Norway. Individual applicability is not determined in this profile.
SCENARIO
Reference energy scenario for this load estimate · simulator engine
what this estimate is · Inputs: 17,034 p.e. of reported load; equivalent average load 13,287 p.e. with the reference profile of Norway (hypothesis with reported load and reference profile; not a measurement). Open this scenario in the simulator · how it is calculated and what it is not.
Reference scenario computed on the server from the reported load and the country profile; an estimate, not a measurement. The simulator recomputes it when opened.
WATER THAT COULD RETURN
Reuse potential
what this estimate is · Volume estimated from the reported load (3,407 m³/day of reference), not measured or available for reclamation.
NEARBY PLANTS
Nearby wastewater treatment plants
| Plant | Distance | Capacity (h-e) | Load 2022 | Treatment |
|---|---|---|---|---|
| Marikoven Sør | 2.9 km | 200 | 132 | primary |
| Marikoven Nord | 3.0 km | 500 | 363 | primary |
| Træet, Follese | 3.1 km | 1,600 | 38 | primary |
| Follese Gamle Skole | 3.3 km | 800 | 623 | primary |
| Drotningsvik | 3.3 km | 3,000 | 1,489 | primary |
Distances are between reported coordinates; proximity does not establish a hydraulic connection.
QUESTIONS
Frequently asked questions about this plant
What capacity does WWTP Storanipa hovudreinseanlegg report?
Reported size: 44,000 h-e design capacity. Received load: 17,034 h-e. Units are retained without conversion.
What treatment is reported?
Treatment P. Nitrogen, phosphorus and UV are shown only when explicitly reported.
How much energy would a reference plant use with the load of Storanipa hovudreinseanlegg?
Aguas SB simulator reference scenario for 17,034 p.e. of reported load: 649,607 kWh per year (48.9 kWh per p.e. of average load), with aeration as 45 % of consumption. Estimate with the country reference profile; not a measurement of the plant.
SOURCE AND CORRECTIONS
Source
reported data · European Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · data 2022 · edition 2023 · source licence: CC BY 4.0 · JSON for this plant · suggest a correction · catalogue 2026-11-06. Reported data, not a current inspection; no compliance judgements.