Worldwide wastewater treatment observatory · Norway
Aguas SB Observatory · public data to understand water
WWTP Tønsberg renseanlegg
Norway · official identifier NO3905.0110.01
160,000h-e design capacity (2022) · 9th of 340
European Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · official identifier NO3905.0110.01 · reported size 160,000 h-e design capacity · received load 158,206 h-e · reported treatment: PST · data year 2022. 9th of 340 records with reported size in the inventory of Norway; 2.1 % of the sum of those 340 records in h-e (sum of records, not national capacity); nearest inventoried plant at 11.3 km. Reported data with their source; estimates are not measurements of the plant.
Aguas SB does not manage this wastewater treatment plant.
WHAT THE DATA REPORT
Reported data official data · 2022
| Treatment | primary + secondary + tertiary (more stringent) (as reported to the EEA: PST) · reported levels |
|---|---|
| Nitrogen removal | not reported |
| Phosphorus removal | yes |
| UV disinfection | not reported |
| Status | active |
| Reported coordinates | 59.2620, 10.4983 precision reported by the source: level 2 what it means |
| Source and year | European Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · dataset record |
FUENTES PÚBLICAS
What public sources report
Documented milestones
- 2017-01-01 · The wastewater permit for the Tønsberg treatment plant entered into force. County Governor of Vestfold
Other published data
| Mean annual volume treated reported in the 2022 cycle | 10,382,971 m³/year (2022) · source |
|---|
Facts taken from public documents, with their date and link; an authorisation, a project or a planned capacity do not prove operation or quantities actually treated. Aguas SB editorial layer, lot L05; it does not change the official data.
REGULATORY REFERENCES
Referencia normativa: Norway
Regulatory framework of Norway. Individual applicability is not determined in this profile.
SCENARIO
Reference energy scenario for this load estimate · simulator engine
what this estimate is · Inputs: 158,206 p.e. of reported load; equivalent average load 123,400 p.e. with the reference profile of Norway (hypothesis with reported load and reference profile; not a measurement). Open this scenario in the simulator · how it is calculated and what it is not.
Reference scenario computed on the server from the reported load and the country profile; an estimate, not a measurement. The simulator recomputes it when opened.
WATER THAT COULD RETURN
Reuse potential
what this estimate is · Volume estimated from the reported load (31,641 m³/day of reference), not measured or available for reclamation.
NEARBY PLANTS
Nearby wastewater treatment plants
| Plant | Distance | Capacity (h-e) | Load 2022 | Treatment |
|---|---|---|---|---|
| Vårnes Renseanlegg | 11.3 km | 15,000 | 23,661 | primary, secondary and tertiary |
| Fuglevik Avløpsanlegg | 16.4 km | 192,000 | 105,460 | primary, secondary and tertiary |
| Andebu Sentrum Renseanlegg | 17.7 km | 2,500 | 2,571 | primary, secondary and tertiary |
| Falkensten Renseanlegg | 19.9 km | 25,000 | 27,471 | primary, secondary and tertiary |
| Søbyholmen Renseanlegg | 21.1 km | 4,000 | 2,462 | primary, secondary and tertiary |
Distances are between reported coordinates; proximity does not establish a hydraulic connection.
QUESTIONS
Frequently asked questions about this plant
What capacity does WWTP Tønsberg renseanlegg report?
Reported size: 160,000 h-e design capacity. Received load: 158,206 h-e. Units are retained without conversion.
What treatment is reported?
Treatment PST. Nitrogen, phosphorus and UV are shown only when explicitly reported.
How much energy would a reference plant use with the load of Tønsberg renseanlegg?
Aguas SB simulator reference scenario for 158,206 p.e. of reported load: 4,429,091 kWh per year (35.9 kWh per p.e. of average load), with aeration as 52 % of consumption. Estimate with the country reference profile; not a measurement of the plant.
SOURCE AND CORRECTIONS
Source
reported data · European Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · data 2022 · edition 2023 · source licence: CC BY 4.0 · JSON for this plant · suggest a correction · catalogue 2026-11-06. Reported data, not a current inspection; no compliance judgements.