Worldwide wastewater treatment observatory · Poland

Aguas SB Observatory · public data to understand water

WWTP Centralna Oczyszczalnia Ścieków · PLLU0060

Poland · official identifier PLLU0060

71,050h-e design capacity (2022) · 155th of 1,654

European Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · official identifier PLLU0060 · reported size 71,050 h-e design capacity · received load 48,413 h-e · reported treatment: PST · data year 2022. 155th of 1,654 records with reported size in the inventory of Poland; 0.13 % of the sum of those 1,654 records in h-e (sum of records, not national capacity); nearest inventoried plant at 10.6 km. Reported data with their source; estimates are not measurements of the plant.

Aguas SB does not manage this wastewater treatment plant.

WHAT THE DATA REPORT

Reported data official data · 2022

71,050h-e design capacity
48,413h-e received load (2022)
68 %reported load/capacity ratio (not hydraulic utilisation)
155th of 1,654by reported size among the 1,654 records with a size in the inventory · 0.13 % of the sum of those records (sum of records, not national capacity) · the largest plants in the country · how it is calculated
Treatmentprimary + secondary + tertiary (more stringent) (as reported to the EEA: PST) · reported levels
Nitrogen removalyes
Phosphorus removalyes
UV disinfectionnot reported
Statusactive
Reported coordinates51.8235, 15.7229 precision reported by the source: level 2 what it means
Source and yearEuropean Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · dataset record

REGULATORY REFERENCES

Referencia normativa: Poland

Regulatory framework of Poland · Directive (EU) 2024/3019: reported-capacity band 10,000 to 149,999 p.e.; obligations are set by agglomeration load, not by the capacity of this plant. Individual applicability is not determined in this profile.

SCENARIO

Reference energy scenario for this load estimate · simulator engine

1,424,460reference kWh per year for this load
37.7kWh per h-e (average load) per year
213,669€ per year at 0.15 €/kWh
61 %share of energy used for aeration

what this estimate is · Inputs: 48,413 p.e. of reported load; equivalent average load 37,736 p.e. with the reference profile of Poland (hypothesis with reported load and reference profile; not a measurement). Open this scenario in the simulator · how it is calculated and what it is not.

Reference scenario computed on the server from the reported load and the country profile; an estimate, not a measurement. The simulator recomputes it when opened.

WATER THAT COULD RETURN

Reuse potential

1.9estimated hm³ of treated water per year
tertiary treatment reporteda starting point for reclamation

what this estimate is · Volume estimated from the reported load (5,229 m³/day of reference), not measured or available for reclamation.

LOCATION

Poland: this plant on the map

this plant on the map · regional directory.

NEARBY PLANTS

Nearby wastewater treatment plants

PlantDistanceCapacity (h-e)Load 2022Treatment
Oczyszczalnia Ścieków Podbrzezie Dolne10.6 km11,75010,466primary, secondary and tertiary
Bytom Odrzański11.4 km10,8004,464primary and secondary
Nowe Miasteczko13.7 km3,8183,133primary and secondary
Trzebiechów22.3 km4,4063,492primary and secondary
Kotla24.4 km2,5502,111primary and secondary

Distances are between reported coordinates; proximity does not establish a hydraulic connection.

QUESTIONS

Frequently asked questions about this plant

What capacity does WWTP Centralna Oczyszczalnia Ścieków · PLLU0060 report?

Reported size: 71,050 h-e design capacity. Received load: 48,413 h-e. Units are retained without conversion.

What treatment is reported?

Treatment PST. Nitrogen, phosphorus and UV are shown only when explicitly reported.

How much energy would a reference plant use with the load of Centralna Oczyszczalnia Ścieków · PLLU0060?

Aguas SB simulator reference scenario for 48,413 p.e. of reported load: 1,424,460 kWh per year (37.7 kWh per p.e. of average load), with aeration as 61 % of consumption. Estimate with the country reference profile; not a measurement of the plant.

SOURCE AND CORRECTIONS

Source

reported data · European Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · data 2022 · edition 2023 · source licence: CC BY 4.0 · JSON for this plant · suggest a correction · catalogue 2026-11-06. Reported data, not a current inspection; no compliance judgements.