Worldwide wastewater treatment observatory · Poland

Aguas SB Observatory · public data to understand water

WWTP GOŚ Dębogórze

Poland · official identifier PLPM0020

550,000h-e design capacity (2022) · 11th of 1,654

European Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · official identifier PLPM0020 · reported size 550,000 h-e design capacity · received load 438,207 h-e · reported treatment: PST · data year 2022. 11th of 1,654 records with reported size in the inventory of Poland; 1.0 % of the sum of those 1,654 records in h-e (sum of records, not national capacity); nearest inventoried plant at 20.2 km. Reported data with their source; estimates are not measurements of the plant.

Aguas SB does not manage this wastewater treatment plant.

WHAT THE DATA REPORT

Reported data official data · 2022

550,000h-e design capacity
438,207h-e received load (2022)
80 %reported load/capacity ratio (not hydraulic utilisation)
11th of 1,654by reported size among the 1,654 records with a size in the inventory · 1.0 % of the sum of those records (sum of records, not national capacity) · the largest plants in the country · how it is calculated
Treatmentprimary + secondary + tertiary (more stringent) (as reported to the EEA: PST) · reported levels
Nitrogen removalyes
Phosphorus removalyes
UV disinfectionnot reported
Statusactive
Reported coordinates54.5789, 18.4314 precision reported by the source: level 2 what it means
Source and yearEuropean Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · dataset record

FUENTES PÚBLICAS

What public sources report

Population of the served area (Gdynia): 369,153 inhabitants (2024, Polish Waters).

Documented milestones

  • 2019-10-07 · The plant permit (GD.RUZ.421.98.2019.BK) became final, according to the national report. Polish Waters

Other published data

Mean annual volume treated reported in the 2022 cycle20,725,000 m³/year (2022) · source

Facts taken from public documents, with their date and link; an authorisation, a project or a planned capacity do not prove operation or quantities actually treated. Aguas SB editorial layer, lot L02; it does not change the official data.

REGULATORY REFERENCES

Referencia normativa: Poland

Regulatory framework of Poland · Directive (EU) 2024/3019: reported-capacity band 150,000 p.e. or more; obligations are set by agglomeration load, not by the capacity of this plant. Individual applicability is not determined in this profile.

SCENARIO

Reference energy scenario for this load estimate · simulator engine

9,263,593reference kWh per year for this load
27.1kWh per h-e (average load) per year
1,389,539€ per year at 0.15 €/kWh
67 %share of energy used for aeration

what this estimate is · Inputs: 438,207 p.e. of reported load; equivalent average load 341,536 p.e. with the reference profile of Poland (hypothesis with reported load and reference profile; not a measurement). Open this scenario in the simulator · how it is calculated and what it is not.

Reference scenario computed on the server from the reported load and the country profile; an estimate, not a measurement. The simulator recomputes it when opened.

WATER THAT COULD RETURN

Reuse potential

17.3estimated hm³ of treated water per year
tertiary treatment reporteda starting point for reclamation

what this estimate is · Volume estimated from the reported load (47,326 m³/day of reference), not measured or available for reclamation.

LOCATION

Poland: this plant on the map

this plant on the map · regional directory.

NEARBY PLANTS

Nearby wastewater treatment plants

PlantDistanceCapacity (h-e)Load 2022Treatment
Oczyszczalnia Ścieków W Luzinie20.2 km13,00011,678primary, secondary and tertiary
Swarzewo21.0 km149,900129,240primary, secondary and tertiary
Jastarnia21.2 km41,00037,570primary, secondary and tertiary
Miejska Oczyszczalnia Ścieków · Plpm034022.9 km20,0009,960primary and secondary
Kłanino24.5 km10,3009,344primary and secondary

Distances are between reported coordinates; proximity does not establish a hydraulic connection.

QUESTIONS

Frequently asked questions about this plant

What capacity does WWTP GOŚ Dębogórze report?

Reported size: 550,000 h-e design capacity. Received load: 438,207 h-e. Units are retained without conversion.

What treatment is reported?

Treatment PST. Nitrogen, phosphorus and UV are shown only when explicitly reported.

How much energy would a reference plant use with the load of GOŚ Dębogórze?

Aguas SB simulator reference scenario for 438,207 p.e. of reported load: 9,263,593 kWh per year (27.1 kWh per p.e. of average load), with aeration as 67 % of consumption. Estimate with the country reference profile; not a measurement of the plant.

SOURCE AND CORRECTIONS

Source

reported data · European Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · data 2022 · edition 2023 · source licence: CC BY 4.0 · JSON for this plant · suggest a correction · catalogue 2026-11-06. Reported data, not a current inspection; no compliance judgements.