Worldwide wastewater treatment observatory · Poland

Aguas SB Observatory · public data to understand water

WWTP Grupowa Oczyszczalnia Ścieków · PLLO0030

Poland · official identifier PLLO0030

337,759h-e design capacity (2022) · 23rd of 1,654

European Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · official identifier PLLO0030 · reported size 337,759 h-e design capacity · received load 199,050 h-e · reported treatment: PST · data year 2022. 23rd of 1,654 records with reported size in the inventory of Poland; 0.63 % of the sum of those 1,654 records in h-e (sum of records, not national capacity); nearest inventoried plant at 15.6 km. Reported data with their source; estimates are not measurements of the plant.

Aguas SB does not manage this wastewater treatment plant.

WHAT THE DATA REPORT

Reported data official data · 2022

337,759h-e design capacity
199,050h-e received load (2022)
59 %reported load/capacity ratio (not hydraulic utilisation)
23rd of 1,654by reported size among the 1,654 records with a size in the inventory · 0.63 % of the sum of those records (sum of records, not national capacity) · the largest plants in the country · how it is calculated
Treatmentprimary + secondary + tertiary (more stringent) (as reported to the EEA: PST) · reported levels
Nitrogen removalyes
Phosphorus removalyes
UV disinfectionnot reported
Statusactive
Reported coordinates52.2057, 19.4110 precision reported by the source: level 1 what it means
Source and yearEuropean Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · dataset record

FUENTES PÚBLICAS

What public sources report

Population of the served area (Aglomeracja Kutno): 43,363 inhabitants (2024, Polish Waters).

Documented milestones

  • 2024-09-18 · The national programme recorded technical acceptance of a type M investment at the plant. Polish Waters

Other published data

Mean annual volume treated reported in the 2022 cycle5,943,000 m³/year (2022) · source

Facts taken from public documents, with their date and link; an authorisation, a project or a planned capacity do not prove operation or quantities actually treated. Aguas SB editorial layer, lot L03; it does not change the official data.

REGULATORY REFERENCES

Referencia normativa: Poland

Regulatory framework of Poland · Directive (EU) 2024/3019: reported-capacity band 150,000 p.e. or more; obligations are set by agglomeration load, not by the capacity of this plant. Individual applicability is not determined in this profile.

SCENARIO

Reference energy scenario for this load estimate · simulator engine

4,441,534reference kWh per year for this load
28.6kWh per h-e (average load) per year
666,230€ per year at 0.15 €/kWh
63 %share of energy used for aeration

what this estimate is · Inputs: 199,050 p.e. of reported load; equivalent average load 155,137 p.e. with the reference profile of Poland (hypothesis with reported load and reference profile; not a measurement). Open this scenario in the simulator · how it is calculated and what it is not.

Reference scenario computed on the server from the reported load and the country profile; an estimate, not a measurement. The simulator recomputes it when opened.

WATER THAT COULD RETURN

Reuse potential

7.8estimated hm³ of treated water per year
tertiary treatment reporteda starting point for reclamation

what this estimate is · Volume estimated from the reported load (21,497 m³/day of reference), not measured or available for reclamation.

LOCATION

Poland: this plant on the map

this plant on the map · regional directory.

NEARBY PLANTS

Nearby wastewater treatment plants

PlantDistanceCapacity (h-e)Load 2022Treatment
Żychlin15.6 km12,6168,112primary and secondary
Pawlikowice15.7 km9,9998,686primary and secondary
Oczyszczalnia Ścieków Gostynin- Zalesie22.1 km2,457806primary and secondary
Oczyszczalnia Ścieków W Łęczycy Przy Ulicy K. Odnowiciela24.9 km27,00016,477primary, secondary and tertiary
Dobrzyń Nad Wisłą25.2 km2,7082,341primary and secondary

Distances are between reported coordinates; proximity does not establish a hydraulic connection.

QUESTIONS

Frequently asked questions about this plant

What capacity does WWTP Grupowa Oczyszczalnia Ścieków · PLLO0030 report?

Reported size: 337,759 h-e design capacity. Received load: 199,050 h-e. Units are retained without conversion.

What treatment is reported?

Treatment PST. Nitrogen, phosphorus and UV are shown only when explicitly reported.

How much energy would a reference plant use with the load of Grupowa Oczyszczalnia Ścieków · PLLO0030?

Aguas SB simulator reference scenario for 199,050 p.e. of reported load: 4,441,534 kWh per year (28.6 kWh per p.e. of average load), with aeration as 63 % of consumption. Estimate with the country reference profile; not a measurement of the plant.

SOURCE AND CORRECTIONS

Source

reported data · European Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · data 2022 · edition 2023 · source licence: CC BY 4.0 · JSON for this plant · suggest a correction · catalogue 2026-11-06. Reported data, not a current inspection; no compliance judgements.