Worldwide wastewater treatment observatory · Poland

Aguas SB Observatory · public data to understand water

WWTP Komunalna Oczyszczalnia Ścieków dla miasta Skierniewice

Poland · official identifier PLLO0110

143,134h-e design capacity (2022) · 74th of 1,654

European Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · official identifier PLLO0110 · reported size 143,134 h-e design capacity · received load 83,504 h-e · reported treatment: PST · data year 2022. 74th of 1,654 records with reported size in the inventory of Poland; 0.27 % of the sum of those 1,654 records in h-e (sum of records, not national capacity); nearest inventoried plant at 11.2 km. Reported data with their source; estimates are not measurements of the plant.

Aguas SB does not manage this wastewater treatment plant.

WHAT THE DATA REPORT

Reported data official data · 2022

143,134h-e design capacity
83,504h-e received load (2022)
58 %reported load/capacity ratio (not hydraulic utilisation)
74th of 1,654by reported size among the 1,654 records with a size in the inventory · 0.27 % of the sum of those records (sum of records, not national capacity) · the largest plants in the country · how it is calculated
Treatmentprimary + secondary + tertiary (more stringent) (as reported to the EEA: PST) · reported levels
Nitrogen removalyes
Phosphorus removalyes
UV disinfectionnot reported
Statusactive
Reported coordinates51.9773, 20.1146 precision reported by the source: level 2 what it means
Source and yearEuropean Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · dataset record

FUENTES PÚBLICAS

What public sources report

Population of the served area (Skierniewice): 43,183 inhabitants (2024, Polish Waters).

Documented milestones

  • 2016-11-21 · The plant permit (RŚVI.7322.1.77.2016.PŁ) became final, according to the national report. Polish Waters

Facts taken from public documents, with their date and link; an authorisation, a project or a planned capacity do not prove operation or quantities actually treated. Aguas SB editorial layer, lot L06; it does not change the official data.

REGULATORY REFERENCES

Referencia normativa: Poland

Regulatory framework of Poland · Directive (EU) 2024/3019: reported-capacity band 10,000 to 149,999 p.e.; obligations are set by agglomeration load, not by the capacity of this plant. Individual applicability is not determined in this profile.

SCENARIO

Reference energy scenario for this load estimate · simulator engine

2,204,914reference kWh per year for this load
33.9kWh per h-e (average load) per year
330,737€ per year at 0.15 €/kWh
61 %share of energy used for aeration

what this estimate is · Inputs: 83,504 p.e. of reported load; equivalent average load 65,080 p.e. with the reference profile of Poland (hypothesis with reported load and reference profile; not a measurement). Open this scenario in the simulator · how it is calculated and what it is not.

Reference scenario computed on the server from the reported load and the country profile; an estimate, not a measurement. The simulator recomputes it when opened.

WATER THAT COULD RETURN

Reuse potential

3.3estimated hm³ of treated water per year
tertiary treatment reporteda starting point for reclamation

what this estimate is · Volume estimated from the reported load (9,018 m³/day of reference), not measured or available for reclamation.

LOCATION

Poland: this plant on the map

this plant on the map · regional directory.

NEARBY PLANTS

Nearby wastewater treatment plants

PlantDistanceCapacity (h-e)Load 2022Treatment
Hydrocentrum · Plmz119011.2 km4,0005,196primary and secondary
Lipce Reymontowskie13.6 km2,6001,991primary and secondary
Miejska Oczyszczalnia Ścieków W Łowiczu17.2 km97,50096,772primary, secondary and tertiary
Michowice17.2 km5,2663,868primary and secondary
Gminna Oczyszczalnia Ścieków W Guzowie22.0 km16,6005,249primary and secondary

Distances are between reported coordinates; proximity does not establish a hydraulic connection.

QUESTIONS

Frequently asked questions about this plant

What capacity does WWTP Komunalna Oczyszczalnia Ścieków dla miasta Skierniewice report?

Reported size: 143,134 h-e design capacity. Received load: 83,504 h-e. Units are retained without conversion.

What treatment is reported?

Treatment PST. Nitrogen, phosphorus and UV are shown only when explicitly reported.

How much energy would a reference plant use with the load of Komunalna Oczyszczalnia Ścieków dla miasta Skierniewice?

Aguas SB simulator reference scenario for 83,504 p.e. of reported load: 2,204,914 kWh per year (33.9 kWh per p.e. of average load), with aeration as 61 % of consumption. Estimate with the country reference profile; not a measurement of the plant.

SOURCE AND CORRECTIONS

Source

reported data · European Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · data 2022 · edition 2023 · source licence: CC BY 4.0 · JSON for this plant · suggest a correction · catalogue 2026-11-06. Reported data, not a current inspection; no compliance judgements.