Worldwide wastewater treatment observatory · Poland

Aguas SB Observatory · public data to understand water

WWTP Komunalna Oczyszczalnia Ścieków · PLKP0190

Poland · official identifier PLKP0190

61,600h-e design capacity (2022) · 182nd of 1,654

European Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · official identifier PLKP0190 · reported size 61,600 h-e design capacity · received load 61,600 h-e · reported treatment: PST · data year 2022. 182nd of 1,654 records with reported size in the inventory of Poland; 0.12 % of the sum of those 1,654 records in h-e (sum of records, not national capacity); nearest inventoried plant at 7.0 km · 1 within 10 km. Reported data with their source; estimates are not measurements of the plant.

Aguas SB does not manage this wastewater treatment plant.

WHAT THE DATA REPORT

Reported data official data · 2022

61,600h-e design capacity
61,600h-e received load (2022)
100 %reported load/capacity ratio (not hydraulic utilisation)
182nd of 1,654by reported size among the 1,654 records with a size in the inventory · 0.12 % of the sum of those records (sum of records, not national capacity) · the largest plants in the country · how it is calculated
Treatmentprimary + secondary + tertiary (more stringent) (as reported to the EEA: PST) · reported levels
Nitrogen removalyes
Phosphorus removalyes
UV disinfectionnot reported
Statusactive
Reported coordinates52.9653, 17.7083 precision reported by the source: level 2 what it means
Source and yearEuropean Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · dataset record

REGULATORY REFERENCES

Referencia normativa: Poland

Regulatory framework of Poland · Directive (EU) 2024/3019: reported-capacity band 10,000 to 149,999 p.e.; obligations are set by agglomeration load, not by the capacity of this plant. Individual applicability is not determined in this profile.

SCENARIO

Reference energy scenario for this load estimate · simulator engine

1,727,820reference kWh per year for this load
36.0kWh per h-e (average load) per year
259,173€ per year at 0.15 €/kWh
61 %share of energy used for aeration

what this estimate is · Inputs: 61,600 p.e. of reported load; equivalent average load 48,012 p.e. with the reference profile of Poland (hypothesis with reported load and reference profile; not a measurement). Open this scenario in the simulator · how it is calculated and what it is not.

Reference scenario computed on the server from the reported load and the country profile; an estimate, not a measurement. The simulator recomputes it when opened.

WATER THAT COULD RETURN

Reuse potential

2.4estimated hm³ of treated water per year
tertiary treatment reporteda starting point for reclamation

what this estimate is · Volume estimated from the reported load (6,653 m³/day of reference), not measured or available for reclamation.

LOCATION

Poland: this plant on the map

this plant on the map · regional directory.

NEARBY PLANTS

Nearby wastewater treatment plants

PlantDistanceCapacity (h-e)Load 2022Treatment
Szubin7.0 km27,10412,592primary, secondary and tertiary
Oczyszczalnia Ścieków W Łabiszynie14.2 km9,4005,550primary and secondary
Oczyszczalnia Ściekowa W Kcyni17.5 km5,9704,261primary and secondary
Gminna Oczyszczalnia Ścieków · Plwl126020.5 km5,3833,398primary and secondary
Oczyszczalnia Lubaszcz Nakło Nad Notecią21.7 km45,92025,400primary, secondary and tertiary

Distances are between reported coordinates; proximity does not establish a hydraulic connection.

QUESTIONS

Frequently asked questions about this plant

What capacity does WWTP Komunalna Oczyszczalnia Ścieków · PLKP0190 report?

Reported size: 61,600 h-e design capacity. Received load: 61,600 h-e. Units are retained without conversion.

What treatment is reported?

Treatment PST. Nitrogen, phosphorus and UV are shown only when explicitly reported.

How much energy would a reference plant use with the load of Komunalna Oczyszczalnia Ścieków · PLKP0190?

Aguas SB simulator reference scenario for 61,600 p.e. of reported load: 1,727,820 kWh per year (36.0 kWh per p.e. of average load), with aeration as 61 % of consumption. Estimate with the country reference profile; not a measurement of the plant.

SOURCE AND CORRECTIONS

Source

reported data · European Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · data 2022 · edition 2023 · source licence: CC BY 4.0 · JSON for this plant · suggest a correction · catalogue 2026-11-06. Reported data, not a current inspection; no compliance judgements.