Worldwide wastewater treatment observatory · Poland

Aguas SB Observatory · public data to understand water

WWTP Krajenka

Poland · official identifier PLWL1370

8,708h-e design capacity (2022) · 787th of 1,654

European Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · official identifier PLWL1370 · reported size 8,708 h-e design capacity · received load 6,037 h-e · reported treatment: PS · data year 2022. 787th of 1,654 records with reported size in the inventory of Poland; 0.02 % of the sum of those 1,654 records in h-e (sum of records, not national capacity); nearest inventoried plant at 6.6 km · 3 within 10 km. Reported data with their source; estimates are not measurements of the plant.

Aguas SB does not manage this wastewater treatment plant.

WHAT THE DATA REPORT

Reported data official data · 2022

8,708h-e design capacity
6,037h-e received load (2022)
69 %reported load/capacity ratio (not hydraulic utilisation)
787th of 1,654by reported size among the 1,654 records with a size in the inventory · 0.02 % of the sum of those records (sum of records, not national capacity) · the largest plants in the country · how it is calculated
Treatmentprimary + secondary (as reported to the EEA: PS) · reported levels
Nitrogen removalnot reported
Phosphorus removalnot reported
UV disinfectionnot reported
Statusactive
Reported coordinates53.2964, 16.9817 precision reported by the source: level 2 what it means
Source and yearEuropean Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · dataset record

REGULATORY REFERENCES

Referencia normativa: Poland

Regulatory framework of Poland · Directive (EU) 2024/3019: reported-capacity band 1,000 to 9,999 p.e.; obligations are set by agglomeration load, not by the capacity of this plant. Individual applicability is not determined in this profile.

SCENARIO

Reference energy scenario for this load estimate · simulator engine

209,115reference kWh per year for this load
44.4kWh per h-e (average load) per year
31,367€ per year at 0.15 €/kWh
75 %share of energy used for aeration

what this estimate is · Inputs: 6,037 p.e. of reported load; equivalent average load 4,705 p.e. with the reference profile of Poland (hypothesis with reported load and reference profile; not a measurement). Open this scenario in the simulator · how it is calculated and what it is not.

Reference scenario computed on the server from the reported load and the country profile; an estimate, not a measurement. The simulator recomputes it when opened.

WATER THAT COULD RETURN

Reuse potential

0.2estimated hm³ of treated water per year
tertiary treatment not reportedreclamation requires additional treatment

what this estimate is · Volume estimated from the reported load (652 m³/day of reference), not measured or available for reclamation.

LOCATION

Poland: this plant on the map

this plant on the map · regional directory.

NEARBY PLANTS

Nearby wastewater treatment plants

PlantDistanceCapacity (h-e)Load 2022Treatment
Oczyszczalnia Dla Aglomeracji Złotów6.6 km29,75222,106primary, secondary and tertiary
Stara Wiśniewka7.1 km520423primary and secondary
Zakrzewo7.8 km3,3002,607primary and secondary
Kaczochy11.1 km2,7702,166primary and secondary
Wysoka15.1 km5,7504,226primary and secondary

Distances are between reported coordinates; proximity does not establish a hydraulic connection.

QUESTIONS

Frequently asked questions about this plant

What capacity does WWTP Krajenka report?

Reported size: 8,708 h-e design capacity. Received load: 6,037 h-e. Units are retained without conversion.

What treatment is reported?

Treatment PS. Nitrogen, phosphorus and UV are shown only when explicitly reported.

How much energy would a reference plant use with the load of Krajenka?

Aguas SB simulator reference scenario for 6,037 p.e. of reported load: 209,115 kWh per year (44.4 kWh per p.e. of average load), with aeration as 75 % of consumption. Estimate with the country reference profile; not a measurement of the plant.

SOURCE AND CORRECTIONS

Source

reported data · European Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · data 2022 · edition 2023 · source licence: CC BY 4.0 · JSON for this plant · suggest a correction · catalogue 2026-11-06. Reported data, not a current inspection; no compliance judgements.