WWTP Mechaniczno-Biologiczna Oczyszczalnia Ścieków w Antoniowie

Poland · official identifier PLOP0130

26,459h-e design capacity (2022) · 370th of 1,654

European Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · official identifier PLOP0130 · reported size 26,459 h-e design capacity · received load 18,112 h-e · reported treatment: PST · data year 2022. 370th of 1,654 records with reported size in the inventory of Poland; 0.05 % of the sum of those 1,654 records in h-e (sum of records, not national capacity); nearest inventoried plant at 7.7 km · 1 within 10 km. Reported data with their source; estimates are not measurements of the plant.

Aguas SB does not manage this wastewater treatment plant.

WHAT THE DATA REPORT

Reported data official data · 2022

26,459h-e design capacity
18,112h-e received load (2022)
68 %reported load/capacity ratio (not hydraulic utilisation)
370th of 1,654by reported size among the 1,654 records with a size in the inventory · 0.05 % of the sum of those records (sum of records, not national capacity) · the largest plants in the country · how it is calculated
Treatmentprimary + secondary + tertiary (more stringent) (as reported to the EEA: PST) · reported levels
Nitrogen removalyes
Phosphorus removalyes
UV disinfectionnot reported
Statusactive
Reported coordinates50.6839, 18.1946 precision reported by the source: level 2 what it means
Source and yearEuropean Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · dataset record

REGULATORY REFERENCES

Regulatory reference: Poland

Regulatory framework of Poland · Directive (EU) 2024/3019: reported-capacity band 10,000 to 149,999 p.e.; obligations are set by agglomeration load, not by the capacity of this plant. Individual applicability is not determined in this profile.

SCENARIO

Reference energy scenario for this load estimate · simulator engine

554,185reference kWh per year for this load
39.3kWh per h-e (average load) per year
83,128€ per year at 0.15 €/kWh
55 %share of energy used for aeration

what this estimate is · Inputs: 18,112 p.e. of reported load; equivalent average load 14,116 p.e. with the reference profile of Poland (hypothesis with reported load and reference profile; not a measurement). Open this scenario in the simulator · how it is calculated and what it is not.

Reference scenario computed on the server from the reported load and the country profile; an estimate, not a measurement. The simulator recomputes it when opened.

WATER THAT COULD RETURN

Reuse potential

0.7estimated hm³ of treated water per year
tertiary treatment reporteda starting point for reclamation

what this estimate is · Volume estimated from the reported load (1,956 m³/day of reference), not measured or available for reclamation.

LOCATION

Poland: this plant on the map

this plant on the map · regional directory.

NEARBY PLANTS

Nearby wastewater treatment plants

PlantDistanceCapacity (h-e)Load 2022Treatment
Staniszcze Małe7.7 km8,0706,225primary and secondary
Oczyszczalnia Ścieków W Kotorzu Małym11.7 km25,80018,300primary, secondary and tertiary
Kosorowice15.0 km15,01511,011primary, secondary and tertiary
Dobrodzień16.9 km9,6954,529primary and secondary
Oczyszczalnia Ścieków W Strzelcach Opolskich18.2 km40,38038,073primary, secondary and tertiary

Distances are between reported coordinates; proximity does not establish a hydraulic connection.

QUESTIONS

Frequently asked questions about this plant

What capacity does WWTP Mechaniczno-Biologiczna Oczyszczalnia Ścieków w Antoniowie report?

Reported size: 26,459 h-e design capacity. Received load: 18,112 h-e. Units are retained without conversion.

What treatment is reported?

Treatment PST. Nitrogen, phosphorus and UV are shown only when explicitly reported.

How much energy would a reference plant use with the load of Mechaniczno-Biologiczna Oczyszczalnia Ścieków w Antoniowie?

Aguas SB simulator reference scenario for 18,112 p.e. of reported load: 554,185 kWh per year (39.3 kWh per p.e. of average load), with aeration as 55 % of consumption. Estimate with the country reference profile; not a measurement of the plant.

SOURCE AND CORRECTIONS

Source

reported data · European Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · data 2022 · edition 2023 · source licence: CC BY 4.0 · JSON for this plant · suggest a correction · catalogue 2026-11-06. Reported data, not a current inspection; no compliance judgements.