Worldwide wastewater treatment observatory · Poland

Aguas SB Observatory · public data to understand water

WWTP Oczyszczalnia Ścieków Golub-Dobrzyń

Poland · official identifier PLKP0220

22,403h-e design capacity (2022) · 408th of 1,654

European Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · official identifier PLKP0220 · reported size 22,403 h-e design capacity · received load 12,151 h-e · reported treatment: PST · data year 2022. 408th of 1,654 records with reported size in the inventory of Poland; 0.04 % of the sum of those 1,654 records in h-e (sum of records, not national capacity); nearest inventoried plant at 17.6 km. Reported data with their source; estimates are not measurements of the plant.

Aguas SB does not manage this wastewater treatment plant.

WHAT THE DATA REPORT

Reported data official data · 2022

22,403h-e design capacity
12,151h-e received load (2022)
54 %reported load/capacity ratio (not hydraulic utilisation)
408th of 1,654by reported size among the 1,654 records with a size in the inventory · 0.04 % of the sum of those records (sum of records, not national capacity) · the largest plants in the country · how it is calculated
Treatmentprimary + secondary + tertiary (more stringent) (as reported to the EEA: PST) · reported levels
Nitrogen removalyes
Phosphorus removalyes
UV disinfectionnot reported
Statusactive
Reported coordinates53.1030, 19.0347 precision reported by the source: level 1 what it means
Source and yearEuropean Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · dataset record

REGULATORY REFERENCES

Referencia normativa: Poland

Regulatory framework of Poland · Directive (EU) 2024/3019: reported-capacity band 10,000 to 149,999 p.e.; obligations are set by agglomeration load, not by the capacity of this plant. Individual applicability is not determined in this profile.

SCENARIO

Reference energy scenario for this load estimate · simulator engine

375,113reference kWh per year for this load
39.6kWh per h-e (average load) per year
56,267€ per year at 0.15 €/kWh
54 %share of energy used for aeration

what this estimate is · Inputs: 12,151 p.e. of reported load; equivalent average load 9,468 p.e. with the reference profile of Poland (hypothesis with reported load and reference profile; not a measurement). Open this scenario in the simulator · how it is calculated and what it is not.

Reference scenario computed on the server from the reported load and the country profile; an estimate, not a measurement. The simulator recomputes it when opened.

WATER THAT COULD RETURN

Reuse potential

0.5estimated hm³ of treated water per year
tertiary treatment reporteda starting point for reclamation

what this estimate is · Volume estimated from the reported load (1,312 m³/day of reference), not measured or available for reclamation.

LOCATION

Poland: this plant on the map

this plant on the map · regional directory.

NEARBY PLANTS

Nearby wastewater treatment plants

PlantDistanceCapacity (h-e)Load 2022Treatment
Oczyszczalnia Ścieków W Dobrzejewicach17.6 km4,6672,986primary and secondary
Oczyszczalnia Wąbrzeźno19.2 km28,62018,190primary, secondary and tertiary
Lubin20.3 km2,6632,612primary and secondary
Czernikowo21.2 km4,4923,465primary and secondary
Biskupiec · Plwm050024.8 km8,3338,056primary and secondary

Distances are between reported coordinates; proximity does not establish a hydraulic connection.

QUESTIONS

Frequently asked questions about this plant

What capacity does WWTP Oczyszczalnia Ścieków Golub-Dobrzyń report?

Reported size: 22,403 h-e design capacity. Received load: 12,151 h-e. Units are retained without conversion.

What treatment is reported?

Treatment PST. Nitrogen, phosphorus and UV are shown only when explicitly reported.

How much energy would a reference plant use with the load of Oczyszczalnia Ścieków Golub-Dobrzyń?

Aguas SB simulator reference scenario for 12,151 p.e. of reported load: 375,113 kWh per year (39.6 kWh per p.e. of average load), with aeration as 54 % of consumption. Estimate with the country reference profile; not a measurement of the plant.

SOURCE AND CORRECTIONS

Source

reported data · European Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · data 2022 · edition 2023 · source licence: CC BY 4.0 · JSON for this plant · suggest a correction · catalogue 2026-11-06. Reported data, not a current inspection; no compliance judgements.