Worldwide wastewater treatment observatory · Poland

Aguas SB Observatory · public data to understand water

WWTP Oczyszczalnia Ścieków w Cieszynie

Poland · official identifier PLSL0290

99,999h-e design capacity (2022) · 100th of 1,654 (tied with 1 others)

European Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · official identifier PLSL0290 · reported size 99,999 h-e design capacity · received load 36,699 h-e · reported treatment: PST · data year 2022. 100th of 1,654 records with reported size in the inventory of Poland (tied with 1 others); 0.19 % of the sum of those 1,654 records in h-e (sum of records, not national capacity); nearest inventoried plant at 4.2 km · 3 within 10 km. Reported data with their source; estimates are not measurements of the plant.

Aguas SB does not manage this wastewater treatment plant.

WHAT THE DATA REPORT

Reported data official data · 2022

99,999h-e design capacity
36,699h-e received load (2022)
37 %reported load/capacity ratio (not hydraulic utilisation)
100th of 1,654by reported size among the 1,654 records with a size in the inventory (tied with 1 others) · 0.19 % of the sum of those records (sum of records, not national capacity) · the largest plants in the country · how it is calculated
Treatmentprimary + secondary + tertiary (more stringent) (as reported to the EEA: PST) · reported levels
Nitrogen removalyes
Phosphorus removalyes
UV disinfectionnot reported
Statusactive
Reported coordinates49.7731, 18.6108 precision reported by the source: level 2 what it means
Source and yearEuropean Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · dataset record

REGULATORY REFERENCES

Referencia normativa: Poland

Regulatory framework of Poland · Directive (EU) 2024/3019: reported-capacity band 10,000 to 149,999 p.e.; obligations are set by agglomeration load, not by the capacity of this plant. Individual applicability is not determined in this profile.

SCENARIO

Reference energy scenario for this load estimate · simulator engine

1,127,428reference kWh per year for this load
39.4kWh per h-e (average load) per year
169,114€ per year at 0.15 €/kWh
60 %share of energy used for aeration

what this estimate is · Inputs: 36,699 p.e. of reported load; equivalent average load 28,600 p.e. with the reference profile of Poland (hypothesis with reported load and reference profile; not a measurement). Open this scenario in the simulator · how it is calculated and what it is not.

Reference scenario computed on the server from the reported load and the country profile; an estimate, not a measurement. The simulator recomputes it when opened.

WATER THAT COULD RETURN

Reuse potential

1.4estimated hm³ of treated water per year
tertiary treatment reporteda starting point for reclamation

what this estimate is · Volume estimated from the reported load (3,963 m³/day of reference), not measured or available for reclamation.

LOCATION

Poland: this plant on the map

this plant on the map · regional directory.

NEARBY PLANTS

Nearby wastewater treatment plants

PlantDistanceCapacity (h-e)Load 2022Treatment
Oczyszczalnia Pogwizdów4.2 km7,3754,500primary and secondary
Kończyce Małe9.7 km6,7504,126primary and secondary
Cisownica12.0 km1,8001,560primary and secondary
Zebrzydowice """""""""""""""""""""""""""""""""""""""""""""""12.1 km5,0004,476primary and secondary
Miejska Oczyszczalnia Ścieków Skoczów13.9 km66,00037,055primary, secondary and tertiary

Distances are between reported coordinates; proximity does not establish a hydraulic connection.

QUESTIONS

Frequently asked questions about this plant

What capacity does WWTP Oczyszczalnia Ścieków w Cieszynie report?

Reported size: 99,999 h-e design capacity. Received load: 36,699 h-e. Units are retained without conversion.

What treatment is reported?

Treatment PST. Nitrogen, phosphorus and UV are shown only when explicitly reported.

How much energy would a reference plant use with the load of Oczyszczalnia Ścieków w Cieszynie?

Aguas SB simulator reference scenario for 36,699 p.e. of reported load: 1,127,428 kWh per year (39.4 kWh per p.e. of average load), with aeration as 60 % of consumption. Estimate with the country reference profile; not a measurement of the plant.

SOURCE AND CORRECTIONS

Source

reported data · European Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · data 2022 · edition 2023 · source licence: CC BY 4.0 · JSON for this plant · suggest a correction · catalogue 2026-11-06. Reported data, not a current inspection; no compliance judgements.