Worldwide wastewater treatment observatory · Poland

Aguas SB Observatory · public data to understand water

WWTP Oczyszczalnia Ścieków w Oleśnie

Poland · official identifier PLOP0240

17,917h-e design capacity (2022) · 469th of 1,654

European Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · official identifier PLOP0240 · reported size 17,917 h-e design capacity · received load 10,066 h-e · reported treatment: PST · data year 2022. 469th of 1,654 records with reported size in the inventory of Poland; 0.03 % of the sum of those 1,654 records in h-e (sum of records, not national capacity); nearest inventoried plant at 13.8 km. Reported data with their source; estimates are not measurements of the plant.

Aguas SB does not manage this wastewater treatment plant.

WHAT THE DATA REPORT

Reported data official data · 2022

17,917h-e design capacity
10,066h-e received load (2022)
56 %reported load/capacity ratio (not hydraulic utilisation)
469th of 1,654by reported size among the 1,654 records with a size in the inventory · 0.03 % of the sum of those records (sum of records, not national capacity) · the largest plants in the country · how it is calculated
Treatmentprimary + secondary + tertiary (more stringent) (as reported to the EEA: PST) · reported levels
Nitrogen removalyes
Phosphorus removalyes
UV disinfectionnot reported
Statusactive
Reported coordinates50.8759, 18.3881 precision reported by the source: level 2 what it means
Source and yearEuropean Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · dataset record

REGULATORY REFERENCES

Regulatory reference: Poland

Regulatory framework of Poland · Directive (EU) 2024/3019: reported-capacity band 10,000 to 149,999 p.e.; obligations are set by agglomeration load, not by the capacity of this plant. Individual applicability is not determined in this profile.

SCENARIO

Reference energy scenario for this load estimate · simulator engine

313,648reference kWh per year for this load
40.0kWh per h-e (average load) per year
47,047€ per year at 0.15 €/kWh
54 %share of energy used for aeration

what this estimate is · Inputs: 10,066 p.e. of reported load; equivalent average load 7,845 p.e. with the reference profile of Poland (hypothesis with reported load and reference profile; not a measurement). Open this scenario in the simulator · how it is calculated and what it is not.

Reference scenario computed on the server from the reported load and the country profile; an estimate, not a measurement. The simulator recomputes it when opened.

WATER THAT COULD RETURN

Reuse potential

0.4estimated hm³ of treated water per year
tertiary treatment reporteda starting point for reclamation

what this estimate is · Volume estimated from the reported load (1,087 m³/day of reference), not measured or available for reclamation.

LOCATION

Poland: this plant on the map

this plant on the map · regional directory.

NEARBY PLANTS

Nearby wastewater treatment plants

PlantDistanceCapacity (h-e)Load 2022Treatment
Trzebiszyn13.8 km3,6672,643primary and secondary
Oczyszczalni Ścieków Sieraków Śląski15.9 km6,8003,107primary and secondary
Dobrodzień16.5 km9,6954,529primary and secondary
Oczyszczalnia Ścieków W Ligocie Dolnej19.4 km57,45028,550primary, secondary and tertiary
Oczyszczalnia Ścieków Praszka20.4 km12,89111,547primary, secondary and tertiary

Distances are between reported coordinates; proximity does not establish a hydraulic connection.

QUESTIONS

Frequently asked questions about this plant

What capacity does WWTP Oczyszczalnia Ścieków w Oleśnie report?

Reported size: 17,917 h-e design capacity. Received load: 10,066 h-e. Units are retained without conversion.

What treatment is reported?

Treatment PST. Nitrogen, phosphorus and UV are shown only when explicitly reported.

How much energy would a reference plant use with the load of Oczyszczalnia Ścieków w Oleśnie?

Aguas SB simulator reference scenario for 10,066 p.e. of reported load: 313,648 kWh per year (40.0 kWh per p.e. of average load), with aeration as 54 % of consumption. Estimate with the country reference profile; not a measurement of the plant.

SOURCE AND CORRECTIONS

Source

reported data · European Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · data 2022 · edition 2023 · source licence: CC BY 4.0 · JSON for this plant · suggest a correction · catalogue 2026-11-06. Reported data, not a current inspection; no compliance judgements.